855 York Mills Rd, Toronto: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 855 York Mills Rd, Toronto was permitted on January 3, 2025 with a stated construction value of under $1M. Proposal for replacement of the exterior ramp and stairs and upgrades to entrance doors and parking lot in order to meet with latest accessible requirements. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address855 York Mills Rd, Toronto
NeighbourhoodBanbury-Don Mills
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedJanuary 3, 2025
Stated construction valueunder $1M
Estimated stageLikely complete
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for replacement of the exterior ramp and stairs and upgrades to entrance doors and parking lot in order to meet with latest accessible requirements”

Where this project is

  1. Since June 200830 other permits at this address
  2. February 3, 2009Addition or alteration: structural work · under $1M
  3. May 6, 2014Addition or alteration: interior alteration · under $1M
  4. June 25, 2015Plumbing: roofing · under $1M
  5. January 11, 2023Mechanical: roofing · under $1M
  6. January 3, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  7. March 25, 2026Plumbing · under $1M
  8. January 2025Estimated construction start (estimate)
  9. August 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 3 more renovations within 1 km

  • 41 Lesmill RdAddition or alteration: interior alteration · $5M to $10M · May 2026
  • 111 Moatfield DrDesignated Structures · $1M to $5M · June 2026
  • 1400 Don Mills RdAddition or alteration: structural work · $1M to $5M · April 2026
  • 155 Lesmill RdDrains and site services · $1M to $5M · July 2026
  • 95-105 Moatfield DrAddition or alteration: facade work · $1M to $5M · July 2026

9 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 855 York Mills Rd?

Office and Tenant Fit-Out. Proposal for replacement of the exterior ramp and stairs and upgrades to entrance doors and parking lot in order to meet with latest accessible requirements

When was the permit issued for 855 York Mills Rd?

January 3, 2025, by the City of Toronto.

Who is building 855 York Mills Rd?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 855 York Mills Rd need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.