900 W Wilshire Blvd, Los Angeles: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 900 W Wilshire Blvd, Los Angeles was permitted on January 17, 2025 with a stated construction value of under $1M. Interior office tenant improvement. new non-structural partitions, ceiling, doors, finishes, and fixtures. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address900 W Wilshire Blvd, Los Angeles
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedJanuary 17, 2025
Stated construction valueunder $1M
Estimated stageMechanical
Company named on the permitTaslimi Construction Co Inc
Decision makers and contactsSee who to contact — free trial

From the permit: “Interior office tenant improvement. new non-structural partitions, ceiling, doors, finishes, and fixtures”

Where this project is

  1. January 17, 2025Alteration: Office and Tenant Fit-Out · under $1M (this page)
  2. February 2025Estimated construction start (estimate)
  3. August 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby: 5 more renovations within 1 km

18 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Taslimi Construction Co Inc has 14 other projects in Builtie

  • Los Angeles · Interior alteration · $5M to $10M · 2026
  • Los Angeles · Interior alteration · $1M to $5M · 2025
  • Los Angeles · Interior alteration · $1M to $5M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Feb 2025 – Aug 2025Estimate
Construction Site SecurityJan 2025 – Mar 2025Window passed (est.)
PaintingFeb 2025 – Apr 2025Window passed (est.)
ElectricalMar 2025 – Apr 2025Window passed (est.)
HVAC and MechanicalMar 2025 – Apr 2025Window passed (est.)
PlumbingMar 2025 – Apr 2025Window passed (est.)
Fire ProtectionMar 2025 – Apr 2025Window passed (est.)
Signage and WayfindingApr 2025 – Jun 2025Window passed (est.)
InsulationMar 2025 – Apr 2025Window passed (est.)
DrywallApr 2025 – May 2025Window passed (est.)
Low Voltage and DataApr 2025 – May 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (February 2025) to the estimated completion (August 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Los Angeles

All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 900 W Wilshire Blvd?

Office and Tenant Fit-Out. Interior office tenant improvement. new non-structural partitions, ceiling, doors, finishes, and fixtures

When was the permit issued for 900 W Wilshire Blvd?

January 17, 2025, by the City of Los Angeles.

Who is building 900 W Wilshire Blvd?

Taslimi Construction Co Inc is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 900 W Wilshire Blvd need now?

Estimated from the permit date, the award windows for site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation, drywall and low-voltage had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.