91-02 88 Avenue, Queens, New York City: Institutional Project Renovation

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Institutional Project Renovation at 91-02 88 Avenue, Queens, New York City was filed with New York City on October 22, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Pending Plan Examiner Assignment). Renovate existing library in room 223 - remove existing non-structural partitions - modify suspended ceiling - replace existing interior door - no change in use - no change in occupancy - no change in egress - no change in ventilation. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address91-02 88 Avenue, Queens, New York City
ProjectInstitutional Project Renovation
Building typeInstitutional
WorkRenovation or alteration
Filed with the cityOctober 22, 2026
City statusNot yet approved (DOB status: Pending Plan Examiner Assignment)
Stated construction valueunder $1M
Company named on the permitAarya Associates Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Renovate existing library in room 223 - remove existing non-structural partitions - modify suspended ceiling - replace existing interior door - no change in use - no change in occupancy - no change in egress - no change in ventilation”

Where this project is

  1. April 3, 2026Alteration · under $1M
  2. April 3, 2026Alteration: site protection · under $1M
  3. April 3, 2026Alteration: site protection · under $1M
  4. October 22, 2026Alteration: Institutional Project Renovation · under $1M (this page)
  5. October 22, 2026Alteration · under $1M
  6. November 2026Estimated construction start (estimate)
  7. May 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Aarya Associates Inc. has 2 other projects in Builtie

  • New York City · Alteration: structural work · under $1M · 2026
  • New York · Supported Scaffold · 2026

See its projects in Builtie — free trial

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 91-02 88 Avenue, Queens?

Institutional Project Renovation. Renovate existing library in room 223 - remove existing non-structural partitions - modify suspended ceiling - replace existing interior door - no change in use - no change in occupancy - no change in egress - no change in ventilation

Has 91-02 88 Avenue, Queens been permitted?

Not yet. The work was filed with New York City on October 22, 2026; the city has not approved it yet (DOB status: Pending Plan Examiner Assignment).

Who is building 91-02 88 Avenue, Queens?

Aarya Associates Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 91-02 88 Avenue, Queens need now?

It depends on the stage; Builtie tracks it.