955 Mount Curve Avenue, Altadena: Fire damage repair After the Eaton Fire

Fire damage repair at 955 Mount Curve Avenue, Altadena, after the January 2025 Eaton Fire, permitted December 26, 2025. The plans show manufactured or prefabricated. It is under construction. Builtie follows every fire rebuild in Los Angeles, address by address.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 955 Mount Curve Avenue, Altadena, CA |
| Fire | Eaton Fire, January 2025 |
| Permits from | unincorporated Los Angeles County |
| Rebuild | Fire damage repair |
| What the plans show | manufactured or prefabricated |
| Where it stands | Rebuild in construction |
| Application filed | June 30, 2025 |
| Building permit issued | December 26, 2025 |
| Last inspection | May 15, 2026 |
| Stated construction value | under $250K |
Read from the Los Angeles County's fire recovery records for 955 Mount Curve Avenue. Owners, applicants and case numbers are left out.
Rebuild progress
| County rebuild progress | |
|---|---|
| ✓ | Rebuild application received |
| ✓ | Zoning review cleared |
| ✓ | Full building plans received |
| ✓ | Building plans approved |
| ✓ | Building permit issued |
| ✓ | Rebuild in construction (now) |
| Construction completed |
The County tracks every fire rebuild through these seven steps. 955 Mount Curve Avenue is at step 6: rebuild in construction.
Trades being bought now
At this point in a rebuild these trades are inside their award window:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
Other rebuilds on Mount Curve Avenue
- 529 Mount Curve Avenue: Single-family home rebuild, under construction
- 559 Mount Curve Avenue: Single-family home rebuild, under construction
- 924 Mount Curve Avenue: Single-family home rebuild, under construction
- 927 Mount Curve Avenue: Accessory dwelling unit (ADU), zoning cleared
- 932 Mount Curve Avenue: Single-family home rebuild, under construction
- 939 Mount Curve Avenue: Single-family home rebuild, under construction
- 969 Mount Curve Avenue: Single-family home rebuild, plans in review
- 1004 Mount Curve Avenue: Single-family home rebuild, plans approved
All of them: fire rebuilds on Mount Curve Avenue, Altadena. The whole area: the Altadena and Pasadena Eaton Fire rebuild tracker.
For contractors
Builtie follows the fire rebuilds across Los Angeles, from Pacific Palisades to Altadena, and shows a trade which rebuilds are at the point where its work is bought. Where a permit names the builder, Builtie attaches the decision makers and their verified contacts.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being rebuilt at 955 Mount Curve Avenue, Altadena?
Fire damage repair (manufactured or prefabricated), after the Eaton Fire of January 2025.
What is the status of the rebuild at 955 Mount Curve Avenue?
Rebuild in construction, read October 20, 2026.