99 Knox Ave, Toronto: 3-Storey Retail Building

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

3-Storey Retail Building at 99 Knox Ave, Toronto was permitted on October 17, 2025 with a stated construction value of under $1M. Proposal to construct a new 3-storey fourplex - UNIT A. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address99 Knox Ave, Toronto
NeighbourhoodGreenwood-Coxwell
Project3-Storey Retail Building
Building typeResidential
WorkNew building
Permit issuedOctober 17, 2025
Housing units4
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal to construct a new 3-storey fourplex - UNIT A”

Where this project is

  1. Since October 202510 other permits at this address
  2. October 17, 2025New construction: 3-Storey Retail Building · under $1M (this page)
  3. October 17, 2025New building · under $1M
  4. November 5, 2025New building · under $1M
  5. November 5, 2025Drains and site services
  6. November 12, 2025New building
  7. November 12, 2025Plumbing
  8. November 2025Estimated construction start (estimate)
  9. May 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 3 more new buildings within 1 km

5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–4, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Nov 2025 – May 2026Estimate
Fire ProtectionDec 2025 – Jan 2026Window passed (est.)
Signage and WayfindingJan 2026 – Mar 2026Window passed (est.)
InsulationDec 2025 – Jan 2026Window passed (est.)
DrywallJan 2026 – Feb 2026Window passed (est.)
Low Voltage and DataJan 2026 – Feb 2026Window passed (est.)
TileJan 2026 – Feb 2026Window passed (est.)
Cabinetry and MillworkJan 2026 – Feb 2026Window passed (est.)
FlooringJan 2026 – Feb 2026Window passed (est.)
CountertopsJan 2026 – Feb 2026Window passed (est.)
Finish CarpentryJan 2026 – Feb 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (November 2025) to the estimated completion (May 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 99 Knox Ave?

3-Storey Retail Building. Proposal to construct a new 3-storey fourplex - UNIT A

When was the permit issued for 99 Knox Ave?

October 17, 2025, by the City of Toronto.

Who is building 99 Knox Ave?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 99 Knox Ave need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.