99 Knox Ave, Toronto: 3-Storey Retail Building

3-Storey Retail Building at 99 Knox Ave, Toronto was permitted on October 17, 2025 with a stated construction value of under $1M. Proposal to construct a new 3-storey fourplex - UNIT A. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 99 Knox Ave, Toronto |
| Neighbourhood | Greenwood-Coxwell |
| Project | 3-Storey Retail Building |
| Building type | Residential |
| Work | New building |
| Permit issued | October 17, 2025 |
| Housing units | 4 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to construct a new 3-storey fourplex - UNIT A”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since October 202510 other permits at this address
- October 17, 2025New construction: 3-Storey Retail Building · under $1M (this page)
- October 17, 2025New building · under $1M
- November 5, 2025New building · under $1M
- November 5, 2025Drains and site services
- November 12, 2025New building
- November 12, 2025Plumbing
- November 2025Estimated construction start (estimate)
- May 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 3 more new buildings within 1 km
- 9 Leslie StNew building · $100M to $250M · November 2025
- 580 Commissioners StAddition or alteration: roofing · $5M to $10M · July 2026
- 1134 Queen St ENew building · $1M to $5M · January 2026
- 41 Richard AveNew building · $1M to $5M · July 2026
5 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Nov 2025 – May 2026 | Estimate |
| Fire Protection | Dec 2025 – Jan 2026 | Window passed (est.) |
| Signage and Wayfinding | Jan 2026 – Mar 2026 | Window passed (est.) |
| Insulation | Dec 2025 – Jan 2026 | Window passed (est.) |
| Drywall | Jan 2026 – Feb 2026 | Window passed (est.) |
| Low Voltage and Data | Jan 2026 – Feb 2026 | Window passed (est.) |
| Tile | Jan 2026 – Feb 2026 | Window passed (est.) |
| Cabinetry and Millwork | Jan 2026 – Feb 2026 | Window passed (est.) |
| Flooring | Jan 2026 – Feb 2026 | Window passed (est.) |
| Countertops | Jan 2026 – Feb 2026 | Window passed (est.) |
| Finish Carpentry | Jan 2026 – Feb 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (November 2025) to the estimated completion (May 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 1275 Danforth Ave: Apartment Building Renovation
- 1245 A Queen St E: Apartment Building Renovation
- 49 Felstead Ave: School Renovation
- 1233 Queen St E: Residential Project Renovation
- 45 Felstead Ave: Healthcare Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 99 Knox Ave?
3-Storey Retail Building. Proposal to construct a new 3-storey fourplex - UNIT A
When was the permit issued for 99 Knox Ave?
October 17, 2025, by the City of Toronto.
Who is building 99 Knox Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 99 Knox Ave need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.