10 Dundas St E, Toronto: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 10 Dundas St E, Toronto was permitted on December 17, 2025 with a stated construction value of under $1M. Proposed interior alteration to Mary Brown's Chicken. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address10 Dundas St E, Toronto
NeighbourhoodDowntown Yonge East
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedDecember 17, 2025
Stated construction valueunder $1M
Estimated stageFinishing
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed interior alteration to Mary Brown's Chicken”

Where this project is

  1. Since May 200748 other permits at this address
  2. August 12, 2008Addition or alteration: interior alteration · under $1M
  3. June 13, 2013Addition or alteration: interior alteration · under $1M
  4. May 17, 2017Addition or alteration: plumbing · under $1M
  5. January 24, 2018Addition or alteration: interior alteration · under $1M
  6. February 25, 2019Addition or alteration: mechanical · under $1M
  7. December 17, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  8. December 2025Estimated construction start (estimate)
  9. July 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 8 Elm StNew building · over $250M · March 2026
  • 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
  • 483 Bay StAddition or alteration: structural work · $50M to $100M · May 2026
  • 227 Gerrard St ENew building · $25M to $50M · October 2025
  • 1 Adelaide St EAddition or alteration: demolition · $25M to $50M · June 2026

59 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Dec 2025 – Jul 2026Estimate
Signage and WayfindingMar 2026 – May 2026Window passed (est.)
CountertopsFeb 2026 – Apr 2026Window passed (est.)
Finish CarpentryFeb 2026 – Apr 2026Window passed (est.)
Appliances and EquipmentMar 2026 – Apr 2026Window passed (est.)
LandscapingMar 2026 – May 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (December 2025) to the estimated completion (July 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 10 Dundas St E?

Office and Tenant Fit-Out. Proposed interior alteration to Mary Brown's Chicken

When was the permit issued for 10 Dundas St E?

December 17, 2025, by the City of Toronto.

Who is building 10 Dundas St E?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 10 Dundas St E need now?

Estimated from the permit date, the award windows for signage; countertop; finish carpentry; appliance and equipment; landscaping had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.