1054-1062 Villa View Dr, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home with an ADU at 1054-1062 Villa View Dr, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on October 13, 2026 with a stated construction value of $500K to $1M, and the rebuild is just permitted; site work and foundations come next (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 1054-1062 Villa View Dr, Pacific Palisades, Los Angeles, CA |
| City permit address | 1054-1062 N Villa View Dr |
| Rebuild | New single-family home with an ADU |
| What the plans show | accessory dwelling unit |
| Building permit issued | October 13, 2026 |
| Status | Just permitted; site work and foundations come next (Builtie's estimate) |
| Stated construction value | $500K to $1M |
| Builder named on the permits | Resolved in Builtie |
| Permits at this address since the fire | 1 |
The facts above are read from the City of Los Angeles building permits filed for 1054-1062 Villa View Dr since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| October 13, 2026 | New single-family home with an ADU | Issued |
1 permit since October 13, 2026. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
1054-1062 Villa View Dr is just permitted; site work and foundations come next (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Excavation and Site Work | Before construction starts |
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
Other rebuilds on Villa View Dr
- 1041 Villa View Dr: New single-family home, likely complete
- 1061 Villa View Dr: New single-family home, foundation
All of them: fire rebuilds on Villa View Dr. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1054-1062 Villa View Dr, Pacific Palisades?
New single-family home with an ADU (accessory dwelling unit), permitted October 13, 2026 after the January 2025 Palisades Fire.
What is the status of the rebuild at 1054-1062 Villa View Dr?
It is just permitted; site work and foundations come next (Builtie's estimate), read October 20, 2026.
Who is building 1054-1062 Villa View Dr?
Builtie resolves the builder behind the permits and attaches a verified decision maker.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.