114 E 4th Avenue, Vancouver: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 114 E 4th Avenue, Vancouver was permitted on April 16, 2025 with a stated construction value of $1M to $5M. Field Review - Addition / Alteration - #300 Interior alterations to provide improvements for a new office tenant at #300 on the 3rd floor of this industrial building on this site. Schedule A provided by Andy Igel Architectural Schedule B provided by Andrew… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 114 E 4th Avenue, Vancouver |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | April 16, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Field Review - Addition / Alteration - #300 Interior alterations to provide improvements for a new office tenant at #300 on the 3rd floor of this industrial building on this site. Schedule A provided by Andy Igel Architectural Schedule B provided by Andrew…”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 5584 Laburnum Street: 3-Storey Apartment Building
- 650 W Georgia Street: Office and Tenant Fit-Out
- 925 Terminal Avenue: Warehouse Renovation
- 6260 Killarney Street: Office and Tenant Fit-Out
- 4271 Heather Street: 3-Storey Apartment Building
All of them: construction projects in Vancouver by address. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 114 E 4th Avenue?
Office and Tenant Fit-Out. Field Review - Addition / Alteration - #300 Interior alterations to provide improvements for a new office tenant at #300 on the 3rd floor of this industrial building on this site. Schedule A provided by Andy Igel Architectural Schedule B provided by Andrew…
When was the permit issued for 114 E 4th Avenue?
April 16, 2025, by the City of Vancouver.
Who is building 114 E 4th Avenue?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 114 E 4th Avenue need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
