925 Terminal Avenue, Vancouver: Warehouse Renovation

Warehouse Renovation at 925 Terminal Avenue, Vancouver was permitted on March 26, 2025 with a stated construction value of $1M to $5M. High Density Housing / Commercial - Addition / Alteration - Exterior and interior alterations to change the use from Storage Warehouse to Motor Vehicle Repair Shop (Group F2) in this existing commercial building, on this site. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 925 Terminal Avenue, Vancouver |
| Project | Warehouse Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | March 26, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Mechanical |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “High Density Housing / Commercial - Addition / Alteration - Exterior and interior alterations to change the use from Storage Warehouse to Motor Vehicle Repair Shop (Group F2) in this existing commercial building, on this site”
Which trades are being bought now
The project is with the mechanical, electrical and plumbing rough-in under way. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Painting | 5% to 35% |
| Electrical | 20% to 45% |
| HVAC and Mechanical | 20% to 45% |
| Plumbing | 20% to 45% |
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 114 E 4th Avenue: Office and Tenant Fit-Out
- 5584 Laburnum Street: 3-Storey Apartment Building
- 650 W Georgia Street: Office and Tenant Fit-Out
- 6260 Killarney Street: Office and Tenant Fit-Out
- 4271 Heather Street: 3-Storey Apartment Building
All of them: construction projects in Vancouver by address. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 925 Terminal Avenue?
Warehouse Renovation. High Density Housing / Commercial - Addition / Alteration - Exterior and interior alterations to change the use from Storage Warehouse to Motor Vehicle Repair Shop (Group F2) in this existing commercial building, on this site
When was the permit issued for 925 Terminal Avenue?
March 26, 2025, by the City of Vancouver.
Who is building 925 Terminal Avenue?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 925 Terminal Avenue need now?
At its current stage: site security, painting, electrical, HVAC, plumbing, fire protection, signage, insulation.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
