125 Stuyvesant Avenue, Brooklyn, New York City: Institutional Project Renovation

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Institutional Project Renovation at 125 Stuyvesant Avenue, Brooklyn, New York City was filed with New York City on March 25, 2026 with a stated construction value of $5M to $10M; the city has not approved it yet (DOB status: Objections). P.S. 057-K: Window replacement, limited facade maintenance/renovation, limited repaving, replacement of exterior lighting fixtures, parapet repairs, and miscellaneous exterior repairs. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address125 Stuyvesant Avenue, Brooklyn, New York City
ProjectInstitutional Project Renovation
Building typeInstitutional
WorkRenovation or alteration
Filed with the cityMarch 25, 2026
City statusNot yet approved (DOB status: Objections)
Stated construction value$5M to $10M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “P.S. 057-K: Window replacement, limited facade maintenance/renovation, limited repaving, replacement of exterior lighting fixtures, parapet repairs, and miscellaneous exterior repairs”

Where this project is

  1. March 25, 2026Alteration: Institutional Project Renovation · $5M to $10M (this page)
  2. May 2026Estimated construction start (estimate)
  3. November 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 20 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 4 more renovations within 1 km

14 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 3 to approach now, 7 passed.

TradeWhen to approach (est.)Status
Construction (est.)May 2026 – Nov 2027Estimate
Construction Site SecurityMar 2026 – Aug 2026Window passed (est.)
Concrete and FoundationApr 2026 – Jun 2026Window passed (est.)
Structural SteelMay 2026 – Aug 2026Window passed (est.)
ElevatorsMay 2026 – Sep 2026Window passed (est.)
FramingMay 2026 – Sep 2026Window passed (est.)
PaintingJun 2026 – Dec 2026Approach now
MasonryMay 2026 – Aug 2026Window passed (est.)
WaterproofingMay 2026 – Aug 2026Window passed (est.)
RoofingJul 2026 – Nov 2026Approach now
Windows, Doors and GlazingJun 2026 – Oct 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (November 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 125 Stuyvesant Avenue, Brooklyn?

Institutional Project Renovation. P.S. 057-K: Window replacement, limited facade maintenance/renovation, limited repaving, replacement of exterior lighting fixtures, parapet repairs, and miscellaneous exterior repairs

Has 125 Stuyvesant Avenue, Brooklyn been permitted?

Not yet. The work was filed with New York City on March 25, 2026; the city has not approved it yet (DOB status: Objections).

Who is building 125 Stuyvesant Avenue, Brooklyn?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 125 Stuyvesant Avenue, Brooklyn need now?

Estimated as of October 2026, the trades to approach now are painting; roofing; window, door and glazing. Already passed: site security, concrete, structural steel, elevator, framing, masonry and waterproofing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.