1271 Sixth Avenue, Manhattan, New York City: Restaurant Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Restaurant Renovation at 1271 Sixth Avenue, Manhattan, New York City was permitted on August 27, 2026 with a stated construction value of under $1M. Minor interior demolition.) No change to use, egress or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1271 Sixth Avenue, Manhattan, New York City
ProjectRestaurant Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedAugust 27, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Minor interior demolition.) No change to use, egress or occupancy”

Where this project is

  1. August 27, 2026Alteration: Restaurant Renovation · under $1M (this page)
  2. August 28, 2026Alteration: plumbing · under $1M
  3. August 28, 2026Alteration: mechanical · under $1M
  4. August 28, 2026Alteration: fire protection · under $1M
  5. September 2026Estimated construction start (estimate)
  6. March 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 375 Madison Avenue, ManhattanAlteration: facade work · $100M to $250M · July 2026
  • 592 7 Avenue, ManhattanAlteration CO: conversion to residential · $100M to $250M · July 2026
  • 325 Park Avenue, ManhattanAlteration: structural work · $100M to $250M · March 2026
  • 1730 Broadway, ManhattanAlteration CO: conversion to residential · $50M to $100M · March 2026
  • 10 Rockefeller Plaza, ManhattanAlteration CO · $50M to $100M · July 2026

223 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

The company behind this project has 15 other projects in Builtie

  • New York City · Alteration · $1M to $5M · 2026
  • New York City · Alteration · under $1M · 2026
  • New York City · Alteration · under $1M · 2026

Reveal the builder — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 10 to approach now.

TradeWhen to approach (est.)Status
Construction (est.)Sep 2026 – Mar 2027Estimate
Construction Site SecuritySep 2026 – Oct 2026Approach now
Concrete and FoundationSep 2026 – Oct 2026Approach now
Structural SteelSep 2026 – Oct 2026Approach now
ElevatorsSep 2026 – Nov 2026Approach now
FramingSep 2026 – Nov 2026Approach now
PaintingOct 2026 – Nov 2026Approach now
MasonrySep 2026 – Oct 2026Approach now
WaterproofingSep 2026 – Oct 2026Approach now
RoofingOct 2026 – Nov 2026Approach now
Windows, Doors and GlazingOct 2026 – Nov 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1271 Sixth Avenue, Manhattan?

Restaurant Renovation. Minor interior demolition.) No change to use, egress or occupancy

When was the permit issued for 1271 Sixth Avenue, Manhattan?

August 27, 2026, by New York City.

Who is building 1271 Sixth Avenue, Manhattan?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1271 Sixth Avenue, Manhattan need now?

Estimated as of October 2026, the trades to approach now are site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.