130-140 St George St, Toronto: Campus Building Renovation

Campus Building Renovation at 130-140 St George St, Toronto was permitted on July 8, 2025 with a stated construction value of under $1M. Proposed replacement of existing shell and tube heat exchanger located in sub-basement with two (2) new brazed plate heat exchangers. Installation of new electric steam boiler in sub-basement for AHU humidification, with existing steam generator remaining as… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 130-140 St George St, Toronto |
| Neighbourhood | University |
| Project | Campus Building Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | July 8, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Likely complete |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposed replacement of existing shell and tube heat exchanger located in sub-basement with two (2) new brazed plate heat exchangers. Installation of new electric steam boiler in sub-basement for AHU humidification, with existing steam generator remaining as…”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- July 8, 2025Mechanical: Campus Building Renovation · under $1M (this page)
- July 2025Estimated construction start (estimate)
- February 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 300 Bloor St WNew building · $100M to $250M · July 2026
- 900 Bay StAddition or alteration: interior alteration · $25M to $50M · April 2026
- 150 College StAddition or alteration: demolition · $25M to $50M · May 2026
- 6 Spadina RdAddition or alteration · $10M to $25M · April 2026
- 112 College StAddition or alteration: interior alteration · $10M to $25M · June 2026
28 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
Builtie stages each project as it moves; the trades open on it change week to week.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 33 Russell St: Campus Building Renovation
- 100 Queen's Park: Institutional Project Renovation
- 6 Kings College Rd: Campus Building Renovation
- 325 Huron St: Campus Building Renovation
- 180 Bloor St W: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 130-140 St George St?
Campus Building Renovation. Proposed replacement of existing shell and tube heat exchanger located in sub-basement with two (2) new brazed plate heat exchangers. Installation of new electric steam boiler in sub-basement for AHU humidification, with existing steam generator remaining as…
When was the permit issued for 130-140 St George St?
July 8, 2025, by the City of Toronto.
Who is building 130-140 St George St?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 130-140 St George St need now?
It depends on the stage; Builtie tracks it.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
