33 Russell St, Toronto: Campus Building Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Campus Building Renovation at 33 Russell St, Toronto was permitted on January 22, 2026 with a stated construction value of under $1M. UofT OFFICE RELOCATION at the SECOND, THIRD, FOURTH and SEVENTH FLOORS of an existing building. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address33 Russell St, Toronto
NeighbourhoodUniversity
ProjectCampus Building Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedJanuary 22, 2026
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitUniversity Of Toronto
Decision makers and contactsSee who to contact — free trial

From the permit: “UofT OFFICE RELOCATION at the SECOND, THIRD, FOURTH and SEVENTH FLOORS of an existing building”

Where this project is

  1. Since March 20019 other permits at this address
  2. March 15, 2001Addition or alteration · under $1M
  3. February 24, 2005Fire and life safety · under $1M
  4. December 29, 2009Addition or alteration: mechanical · under $1M
  5. March 26, 2014Addition or alteration: mechanical · under $1M
  6. October 31, 2014Addition or alteration: structural work · under $1M
  7. January 22, 2026Addition or alteration: Campus Building Renovation · under $1M (this page)
  8. February 2026Estimated construction start (estimate)
  9. August 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 300 Bloor St WNew building · $100M to $250M · July 2026
  • 150 College StAddition or alteration: demolition · $25M to $50M · May 2026
  • 555 University AveAddition or alteration: demolition · $25M to $50M · February 2026
  • 399 Bathurst StAddition or alteration: excavation and shoring · $10M to $25M · November 2025
  • 6 Spadina RdAddition or alteration · $10M to $25M · April 2026

34 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

University Of Toronto has 26 other projects in Builtie

  • Toronto · Plumbing · $50M to $100M · 2026
  • Toronto · Drains and site services: addition · $10M to $25M · 2025
  • Toronto · Plumbing: interior alteration · $10M to $25M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Feb 2026 – Aug 2026Estimate
Fire ProtectionMar 2026 – Apr 2026Window passed (est.)
Signage and WayfindingApr 2026 – Jun 2026Window passed (est.)
InsulationMar 2026 – Apr 2026Window passed (est.)
DrywallMar 2026 – May 2026Window passed (est.)
Low Voltage and DataMar 2026 – May 2026Window passed (est.)
TileApr 2026 – May 2026Window passed (est.)
Cabinetry and MillworkMar 2026 – May 2026Window passed (est.)
FlooringApr 2026 – May 2026Window passed (est.)
CountertopsApr 2026 – May 2026Window passed (est.)
Finish CarpentryApr 2026 – May 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (February 2026) to the estimated completion (August 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 33 Russell St?

Campus Building Renovation. UofT OFFICE RELOCATION at the SECOND, THIRD, FOURTH and SEVENTH FLOORS of an existing building

When was the permit issued for 33 Russell St?

January 22, 2026, by the City of Toronto.

Who is building 33 Russell St?

University Of Toronto is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 33 Russell St need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.