100 Queen's Park, Toronto: Institutional Project Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Institutional Project Renovation at 100 Queen's Park, Toronto was permitted on November 28, 2025 with a stated construction value of under $1M. Proposed infill portion of south wall - facade retrofit after demolishing planetarium (including connection between both planetarium and museum). Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address100 Queen's Park, Toronto
NeighbourhoodUniversity
ProjectInstitutional Project Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedNovember 28, 2025
Stated construction valueunder $1M
Estimated stageFinishing
Company named on the permitCoreplan Construction Inc.
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposed infill portion of south wall - facade retrofit after demolishing planetarium (including connection between both planetarium and museum)”

Where this project is

  1. Since October 199955 other permits at this address
  2. June 3, 2003Addition or alteration: interior alteration · $1M to $5M
  3. July 2, 2004Addition · $50M to $100M
  4. November 16, 2005Fire and life safety: fire protection · $1M to $5M
  5. July 6, 2010Addition or alteration: interior alteration · $1M to $5M
  6. February 23, 2024Addition or alteration: plumbing · $10M to $25M
  7. November 28, 2025Addition or alteration: Institutional Project Renovation · under $1M (this page)
  8. December 2025Estimated construction start (estimate)
  9. June 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 300 Bloor St WNew building · $100M to $250M · July 2026
  • 717 Church StNew building · $100M to $250M · March 2026
  • 900 Bay StAddition or alteration: interior alteration · $25M to $50M · April 2026
  • 150 College StAddition or alteration: demolition · $25M to $50M · May 2026
  • 6 Spadina RdAddition or alteration · $10M to $25M · April 2026

36 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Dec 2025 – Jun 2026Estimate
Signage and WayfindingMar 2026 – Apr 2026Window passed (est.)
CountertopsFeb 2026 – Mar 2026Window passed (est.)
Finish CarpentryFeb 2026 – Mar 2026Window passed (est.)
Appliances and EquipmentFeb 2026 – Apr 2026Window passed (est.)
LandscapingMar 2026 – May 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (December 2025) to the estimated completion (June 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 100 Queen's Park?

Institutional Project Renovation. Proposed infill portion of south wall - facade retrofit after demolishing planetarium (including connection between both planetarium and museum)

When was the permit issued for 100 Queen's Park?

November 28, 2025, by the City of Toronto.

Who is building 100 Queen's Park?

Coreplan Construction Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 100 Queen's Park need now?

Estimated from the permit date, the award windows for signage; countertop; finish carpentry; appliance and equipment; landscaping had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.