141 Convent Avenue, Manhattan, New York City: School Renovation

School Renovation at 141 Convent Avenue, Manhattan, New York City was permitted on May 27, 2026 with a stated construction value of under $1M. Spitzer School: Replacement of existing roof drains in kind. Removal and replacement of the existing concrete topping slab at the school entrance with pavers and IRMA roofing system. Localized concrete facade repairs to address leaks. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 141 Convent Avenue, Manhattan, New York City |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | May 27, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Spitzer School: Replacement of existing roof drains in kind. Removal and replacement of the existing concrete topping slab at the school entrance with pavers and IRMA roofing system. Localized concrete facade repairs to address leaks”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- May 27, 2026Alteration: School Renovation · under $1M (this page)
- June 16, 2026Alteration: structural work · under $1M
- July 30, 2026Alteration: roofing · under $1M
- June 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 1430 Amsterdam Avenue, ManhattanAlteration: plumbing · $25M to $50M · September 2026
- 1420 Amsterdam Avenue, ManhattanAlteration: plumbing · $25M to $50M · June 2026
- 103 West 141 Street, ManhattanAlteration CO: structural work · $10M to $25M · April 2026
- 301 West 140 Street, ManhattanAlteration · $5M to $10M · September 2026
- 95 Old Broadway, ManhattanInterior alteration · $5M to $10M · July 2026
49 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Dec 2026 | Estimate |
| Construction Site Security | Jun 2026 – Jul 2026 | Window passed (est.) |
| Concrete and Foundation | Jun 2026 – Jul 2026 | Window passed (est.) |
| Structural Steel | Jun 2026 – Jul 2026 | Window passed (est.) |
| Elevators | Jun 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jun 2026 – Aug 2026 | Window passed (est.) |
| Painting | Jul 2026 – Aug 2026 | Window passed (est.) |
| Masonry | Jun 2026 – Jul 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Roofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jul 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 129 West 142 Street, Manhattan: 6-Storey Apartment Building Renovation
- 645 Malcolm X Boulevard, Manhattan: 6-Storey Apartment Building Renovation
- 649 Malcolm X Boulevard, Manhattan: 6-Storey Apartment Building Renovation
- 54 Greene Avenue, Brooklyn: 4-Storey Apartment Building Renovation
- 253 West 42 Street, Manhattan: Restaurant Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 141 Convent Avenue, Manhattan?
School Renovation. Spitzer School: Replacement of existing roof drains in kind. Removal and replacement of the existing concrete topping slab at the school entrance with pavers and IRMA roofing system. Localized concrete facade repairs to address leaks
When was the permit issued for 141 Convent Avenue, Manhattan?
May 27, 2026, by New York City.
Who is building 141 Convent Avenue, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 141 Convent Avenue, Manhattan need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.