149 Beach 4 Street, Queens, New York City: 3-Storey Two-Family House

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

3-Storey Two-Family House at 149 Beach 4 Street, Queens, New York City was permitted on July 28, 2026 with a stated construction value of $1M to $5M. New two-family house, 3 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address149 Beach 4 Street, Queens, New York City
Project3-Storey Two-Family House
Building typeResidential
WorkNew building
Storeys3
Permit issuedJuly 28, 2026
Stated construction value$1M to $5M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. April 22, 2026New construction · $1M to $5M
  2. June 22, 2026New construction
  3. July 28, 2026New construction: 3-Storey Two-Family House · $1M to $5M (this page)
  4. September 2, 2026Alteration · under $1M
  5. August 2026Estimated construction start (estimate)
  6. August 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.

Other big projects nearby

4 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–3, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 9 to approach now, 1 passed.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2026 – Aug 2027Estimate
Construction Site SecurityJul 2026 – Oct 2026Approach now
Concrete and FoundationAug 2026 – Sep 2026Window passed (est.)
Structural SteelAug 2026 – Oct 2026Approach now
ElevatorsAug 2026 – Nov 2026Approach now
FramingAug 2026 – Nov 2026Approach now
PaintingSep 2026 – Jan 2027Approach now
MasonryAug 2026 – Oct 2026Approach now
WaterproofingAug 2026 – Oct 2026Approach now
RoofingOct 2026 – Dec 2026Approach now
Windows, Doors and GlazingSep 2026 – Nov 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (August 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 149 Beach 4 Street, Queens?

3-Storey Two-Family House. New two-family house, 3 storeys.

When was the permit issued for 149 Beach 4 Street, Queens?

July 28, 2026, by New York City.

Who is building 149 Beach 4 Street, Queens?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 149 Beach 4 Street, Queens need now?

Estimated as of October 2026, the trades to approach now are site security; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing. Already passed: concrete.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.