150 West End Avenue, Manhattan, New York City: Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 25, 2026 from Builtie's permit data.

Apartment Building Renovation at 150 West End Avenue, Manhattan, New York City was permitted on July 15, 2026 with a stated construction value of under $1M. Combine apts. 29j w/29kl per tppn 3/97, renovate 4 bathrooms, 29j kitchen to be removed., 29k kitchen to be removed. replace with new laundry., 29l kitchen to be restored to original kitchen location., new & modifications to non-structural partitions. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address150 West End Avenue, Manhattan, New York City
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedJuly 15, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitTm Construction Of NY Inc. See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Combine apts. 29j w/29kl per tppn 3/97, renovate 4 bathrooms, 29j kitchen to be removed., 29k kitchen to be removed. replace with new laundry., 29l kitchen to be restored to original kitchen location., new & modifications to non-structural partitions”

Where this project is

  1. Since May 20262 other permits at this address
  2. May 8, 2026Interior alteration · under $1M
  3. May 8, 2026Alteration: plumbing · under $1M
  4. May 27, 2026Interior alteration · under $1M
  5. July 15, 2026Alteration: Apartment Building Renovation · under $1M (this page)
  6. July 15, 2026Alteration: plumbing · under $1M
  7. October 5, 2026Alteration: structural work · under $1M
  8. July 2026Estimated construction start (estimate)
  9. February 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 440 West 57 Street, ManhattanAlteration CO: conversion to residential · $25M to $50M · March 2026
  • 77 West 66 Street, ManhattanDemolition · $10M to $25M · March 2026
  • 1980 Broadway, ManhattanAlteration CO: interior alteration · $10M to $25M · September 2026
  • 47 West 66 Street, ManhattanDemolition · $5M to $10M · April 2026
  • 36 West 66 Street, ManhattanAlteration CO · $5M to $10M · August 2026

45 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Tm Construction Of NY Inc. has 3 other projects in Builtie

  • New York City · Interior alteration · under $1M · 2026
  • New York · General Construction · 2026
  • New York · General Construction · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 1 to approach now, 9 passed.

TradeWhen to approach (est.)Status
Construction (est.)Jul 2026 – Feb 2027Estimate
Construction Site SecurityJul 2026 – Aug 2026Window passed (est.)
Concrete and FoundationJul 2026 – Aug 2026Window passed (est.)
Structural SteelJul 2026 – Aug 2026Window passed (est.)
ElevatorsJul 2026 – Sep 2026Window passed (est.)
FramingJul 2026 – Sep 2026Window passed (est.)
PaintingAug 2026 – Oct 2026Approach now
MasonryJul 2026 – Aug 2026Window passed (est.)
WaterproofingJul 2026 – Aug 2026Window passed (est.)
RoofingAug 2026 – Sep 2026Window passed (est.)
Windows, Doors and GlazingAug 2026 – Sep 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 150 West End Avenue, Manhattan?

Apartment Building Renovation. Combine apts. 29j w/29kl per tppn 3/97, renovate 4 bathrooms, 29j kitchen to be removed., 29k kitchen to be removed. replace with new laundry., 29l kitchen to be restored to original kitchen location., new & modifications to non-structural partitions

When was the permit issued for 150 West End Avenue, Manhattan?

July 15, 2026, by New York City.

Who is building 150 West End Avenue, Manhattan?

Tm Construction Of NY Inc. is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 150 West End Avenue, Manhattan need now?

Estimated as of October 2026, the trades to approach now are painting. Already passed: site security; concrete; structural steel; elevator; framing; masonry; waterproofing; roofing; window, door and glazing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.