Fire rebuild at 1570 Morada Place, Altadena, after the January 2025 Eaton Fire, permitted October 7, 2026. The plans show detached garage. It has its building permit and construction is next. Builtie follows every fire rebuild in Los Angeles, address by address.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The rebuild

Address1570 Morada Place, Altadena, CA
FireEaton Fire, January 2025
Permits fromunincorporated Los Angeles County
RebuildFire rebuild
What the plans showdetached garage
Where it standsBuilding permit issued
Application filedJune 18, 2026
Building permit issuedOctober 7, 2026
Stated construction valueunder $250K

Read from the Los Angeles County's fire recovery records for 1570 Morada Place. Owners, applicants and case numbers are left out.

Rebuild progress

County rebuild progress
✓Rebuild application received
✓Zoning review cleared
✓Full building plans received
✓Building plans approved
✓Building permit issued (now)
Rebuild in construction
Construction completed

The County tracks every fire rebuild through these seven steps. 1570 Morada Place is at step 5: building permit issued.

Trades being bought now

At this point in a rebuild these trades are inside their award window:

TradeAward window
Excavation and Site WorkBefore construction starts
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%

Other rebuilds on Morada Place

All of them: fire rebuilds on Morada Place, Altadena. The whole area: the Altadena and Pasadena Eaton Fire rebuild tracker.

For contractors

Builtie follows the fire rebuilds across Los Angeles, from Pacific Palisades to Altadena, and shows a trade which rebuilds are at the point where its work is bought. Where a permit names the builder, Builtie attaches the decision makers and their verified contacts.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being rebuilt at 1570 Morada Place, Altadena?

Fire rebuild (detached garage), after the Eaton Fire of January 2025.

What is the status of the rebuild at 1570 Morada Place?

Building permit issued, read October 20, 2026.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.