1621 Broadway, Brooklyn, New York City: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 1621 Broadway, Brooklyn, New York City was filed with New York City on July 16, 2026 with a stated construction value of under $1M; the city has not approved it yet (DOB status: Objections). Tenant infill into existing shell building with basement / cellar. New work includes adding partitions, mechanical, electrical, and plumbing. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address1621 Broadway, Brooklyn, New York City
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Filed with the cityJuly 16, 2026
City statusNot yet approved (DOB status: Objections)
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Tenant infill into existing shell building with basement / cellar. New work includes adding partitions, mechanical, electrical, and plumbing”

Where this project is

  1. July 16, 2026Alteration CO: Office and Tenant Fit-Out · under $1M (this page)
  2. September 25, 2026Alteration CO: plumbing
  3. August 2026Estimated construction start (estimate)
  4. February 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 15 Mother Gaston Boulevard, BrooklynAlteration: facade work · $1M to $5M · March 2026
  • 309 Macdougal Street, BrooklynAlteration: facade work · $1M to $5M · March 2026
  • 242 Cooper Street, BrooklynAlteration · $1M to $5M · March 2026
  • 794 Monroe Street, BrooklynAlteration: demolition · $1M to $5M · April 2026
  • 33 Saratoga Avenue, BrooklynAlteration: facade work · $1M to $5M · July 2026

11 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

The company behind this project has 4 other projects in Builtie

  • New York City · Alteration · under $1M · 2026
  • New York · Structural · 2026
  • New York · General Construction · 2026

Reveal the builder — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 2 to approach now, 8 passed.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2026 – Feb 2027Estimate
Construction Site SecurityJul 2026 – Sep 2026Window passed (est.)
Concrete and FoundationAug 2026Window passed (est.)
Structural SteelAug 2026 – Sep 2026Window passed (est.)
ElevatorsAug 2026 – Sep 2026Window passed (est.)
FramingAug 2026 – Sep 2026Window passed (est.)
PaintingAug 2026 – Oct 2026Approach now
MasonryAug 2026 – Sep 2026Window passed (est.)
WaterproofingAug 2026 – Sep 2026Window passed (est.)
RoofingSep 2026 – Oct 2026Approach now
Windows, Doors and GlazingAug 2026 – Sep 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 1621 Broadway, Brooklyn?

Office and Tenant Fit-Out. Tenant infill into existing shell building with basement / cellar. New work includes adding partitions, mechanical, electrical, and plumbing

Has 1621 Broadway, Brooklyn been permitted?

Not yet. The work was filed with New York City on July 16, 2026; the city has not approved it yet (DOB status: Objections).

Who is building 1621 Broadway, Brooklyn?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 1621 Broadway, Brooklyn need now?

Estimated as of October 2026, the trades to approach now are painting and roofing. Already passed: site security; concrete; structural steel; elevator; framing; masonry; waterproofing; window, door and glazing.