1655 Dupont St, Toronto: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 1655 Dupont St, Toronto was permitted on February 18, 2026 with a stated construction value of under $1M. Proposal to construct interior public corridor and divide existing single office into multiple office tenants. 3RD FLOOR. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 1655 Dupont St, Toronto |
| Neighbourhood | Junction-Wallace Emerson |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | February 18, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Avcon Construction Inc |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to construct interior public corridor and divide existing single office into multiple office tenants. 3RD FLOOR”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since January 20188 other permits at this address
- August 21, 2018Addition or alteration · under $1M
- May 14, 2019Addition or alteration: interior alteration · under $1M
- September 19, 2019Plumbing
- January 29, 2020Addition or alteration: roofing · under $1M
- October 29, 2025Addition or alteration: interior alteration · under $1M
- February 18, 2026Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- March 2026Estimated construction start (estimate)
- September 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 980 Lansdowne AveNew construction · $25M to $50M · December 2025
- 2340 Dundas St WAddition or alteration: demolition · $1M to $5M · July 2026
- 1884 Davenport RdAddition or alteration: roofing · $1M to $5M · May 2026
- 19 Wiltshire AveFire and life safety: fire protection · $1M to $5M · February 2026
- 2611 Dundas St WSmall Residential Projects: conversion to residential · $1M to $5M · August 2026
11 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Mar 2026 – Sep 2026 | Estimate |
| Fire Protection | Apr 2026 – May 2026 | Window passed (est.) |
| Signage and Wayfinding | May 2026 – Jul 2026 | Window passed (est.) |
| Insulation | Apr 2026 – May 2026 | Window passed (est.) |
| Drywall | Apr 2026 – Jun 2026 | Window passed (est.) |
| Low Voltage and Data | Apr 2026 – Jun 2026 | Window passed (est.) |
| Tile | May 2026 – Jun 2026 | Window passed (est.) |
| Cabinetry and Millwork | Apr 2026 – Jun 2026 | Window passed (est.) |
| Flooring | May 2026 – Jun 2026 | Window passed (est.) |
| Countertops | May 2026 – Jun 2026 | Window passed (est.) |
| Finish Carpentry | May 2026 – Jun 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (March 2026) to the estimated completion (September 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 136 Millicent St: 3-Storey Apartment Building
- 1540 Dupont St: Office and Tenant Fit-Out
- 259 Geary Ave: Office and Tenant Fit-Out
- 1100 Lansdowne Ave: Utility Facility Renovation
- 1 Ibms Ward 05: Transit Facility Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 1655 Dupont St?
Office and Tenant Fit-Out. Proposal to construct interior public corridor and divide existing single office into multiple office tenants. 3RD FLOOR
When was the permit issued for 1655 Dupont St?
February 18, 2026, by the City of Toronto.
Who is building 1655 Dupont St?
Avcon Construction Inc is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 1655 Dupont St need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.