166-12 Jamaica Avenue, Queens, New York City: Apartment Building Renovation
Follow this project · we email you when its status or build stage changes

Apartment Building Renovation at 166-12 Jamaica Avenue, Queens, New York City was permitted on June 19, 2026 with a stated construction value of under $1M. PROPOSED CHANGE OF USE AND OCCUPANCY at existing 3rd floor to be converted INTO FIVE (5) NEW CLASS A DWELLING UNITS. Work includes interior renovation, egress changes, and non-structural interior demolition and plumbing work filed separately. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 166-12 Jamaica Avenue, Queens, New York City |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | June 19, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Centauri Development Inc. See the decision makers — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “PROPOSED CHANGE OF USE AND OCCUPANCY at existing 3rd floor to be converted INTO FIVE (5) NEW CLASS A DWELLING UNITS. Work includes interior renovation, egress changes, and non-structural interior demolition and plumbing work filed separately”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since May 20261 other permit at this address
- May 12, 2026Alteration · under $1M
- May 18, 2026Alteration: structural work · under $1M
- June 2, 2026Alteration: plumbing · under $1M
- June 19, 2026Alteration CO: Apartment Building Renovation · under $1M (this page)
- June 25, 2026Alteration · under $1M
- July 20, 2026Alteration CO: conversion to residential · under $1M
- May 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the same company's first permit at this address (May 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 89-26 162 Street, QueensNew building · $25M to $50M · June 2026
- 153-33 89 Avenue, QueensNew building · $1M to $5M · August 2026
- 94-43 159 Street, QueensAlteration: facade work · $1M to $5M · March 2026
- 85-37 168 Street, QueensAlteration CO · $1M to $5M · September 2026
- 9420 Guy R Brewer Boulevard, QueensAlteration: plumbing · $1M to $5M · June 2026
12 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →
Centauri Development Inc. has 28 other projects in Builtie
- New York City · Alteration: roofing · under $1M · 2026
- New York City · Alteration: plumbing · under $1M · 2026
- New York City · Alteration: roofing · under $1M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | May 2026 – Dec 2026 | Estimate |
| Construction Site Security | Apr 2026 – Jun 2026 | Window passed (est.) |
| Concrete and Foundation | May 2026 | Window passed (est.) |
| Structural Steel | May 2026 – Jun 2026 | Window passed (est.) |
| Elevators | May 2026 – Jun 2026 | Window passed (est.) |
| Framing | May 2026 – Jun 2026 | Window passed (est.) |
| Painting | May 2026 – Jul 2026 | Window passed (est.) |
| Masonry | May 2026 – Jun 2026 | Window passed (est.) |
| Waterproofing | May 2026 – Jun 2026 | Window passed (est.) |
| Roofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Windows, Doors and Glazing | May 2026 – Jul 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 2028 East 67 Street, Brooklyn: Single-Family House Renovation
- 1433 East 37 Street, Brooklyn: Two-Family House Renovation
- 1486 Eastern Parkway, Brooklyn: 2-Storey Apartment Building Renovation
- 325 21 Street, Brooklyn: Single-Family House Renovation
- 291 6 Avenue, Brooklyn: Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 166-12 Jamaica Avenue, Queens?
Apartment Building Renovation. PROPOSED CHANGE OF USE AND OCCUPANCY at existing 3rd floor to be converted INTO FIVE (5) NEW CLASS A DWELLING UNITS. Work includes interior renovation, egress changes, and non-structural interior demolition and plumbing work filed separately
When was the permit issued for 166-12 Jamaica Avenue, Queens?
June 19, 2026, by New York City.
Who is building 166-12 Jamaica Avenue, Queens?
Centauri Development Inc. is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 166-12 Jamaica Avenue, Queens need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
