16930 Bollinger Dr, Pacific Palisades: New single-family home After the 2025 Fire

Newly built homes under construction on a residential street
Figures read October 20, 2026 from City of Los Angeles building permits.

New single-family home at 16930 Bollinger Dr, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on September 29, 2026 with a stated construction value of $1M to $5M, and the rebuild is just permitted; site work and foundations come next (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The rebuild

Address16930 Bollinger Dr, Pacific Palisades, Los Angeles, CA
City permit address16930 W Bollinger Dr
RebuildNew single-family home
What the plans show2 storeys, attached garage, fire sprinklers throughout
Building permit issuedSeptember 29, 2026
StatusJust permitted; site work and foundations come next (Builtie's estimate)
Stated construction value$1M to $5M
Builder named on the permitsTundra Construction Design & Build
Permits at this address since the fire1

The facts above are read from the City of Los Angeles building permits filed for 16930 Bollinger Dr since the January 2025 Palisades Fire. Owners and permit numbers are left out.

Permit timeline

IssuedPermitStatus
September 29, 2026New single-family homeIssued

1 permit since September 29, 2026. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.

Where it stands

16930 Bollinger Dr is just permitted; site work and foundations come next (Builtie's estimate).

At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:

TradeAward window
Excavation and Site WorkBefore construction starts
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%

Other rebuilds on Bollinger Dr

All of them: fire rebuilds on Bollinger Dr. Every street: the Pacific Palisades fire rebuild tracker.

For contractors

Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 16930 Bollinger Dr, Pacific Palisades?

New single-family home (2 storeys, attached garage, fire sprinklers throughout), permitted September 29, 2026 after the January 2025 Palisades Fire.

What is the status of the rebuild at 16930 Bollinger Dr?

It is just permitted; site work and foundations come next (Builtie's estimate), read October 20, 2026.

Who is building 16930 Bollinger Dr?

Tundra Construction Design & Build is named on the permits. The decision makers and contacts are in Builtie.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.