18408 W Oxnard St, Los Angeles: Warehouse Renovation

Warehouse Renovation at 18408 W Oxnard St, Los Angeles was permitted on June 25, 2026 with a stated construction value of under $1M. Install new roof ballasted pv system on (e) warehouse per engineering. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 18408 W Oxnard St, Los Angeles |
| Project | Warehouse Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | June 25, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Commercial West Builders |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Install new roof ballasted pv system on (e) warehouse per engineering”
Get new $1M+ projects in Los Angeles every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since November 20255 other permits at this address
- June 5, 2026New building · under $1M
- June 5, 2026New building · under $1M
- June 5, 2026New building · under $1M
- June 5, 2026New building · under $1M
- June 25, 2026Alteration: Warehouse Renovation · under $1M (this page)
- September 14, 2026Alteration: roofing · under $1M
- July 2026Estimated construction start (estimate)
- January 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2026 – Jan 2027 | Estimate |
| Construction Site Security | Jul 2026 – Aug 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 – Aug 2026 | Window passed (est.) |
| Structural Steel | Jul 2026 – Aug 2026 | Window passed (est.) |
| Elevators | Jul 2026 – Aug 2026 | Window passed (est.) |
| Framing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Painting | Aug 2026 – Sep 2026 | Window passed (est.) |
| Masonry | Jul 2026 – Aug 2026 | Window passed (est.) |
| Waterproofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 13274 W Fiji Way: Commercial Project Renovation
- 800 W 6th St: Office and Tenant Fit-Out
- 5161 N Lankershim Blvd: Office and Tenant Fit-Out
- 10250 W Constellation Blvd: Office and Tenant Fit-Out
- 16654-16664 W Ventura Blvd: Office and Tenant Fit-Out
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 18408 W Oxnard St?
Warehouse Renovation. Install new roof ballasted pv system on (e) warehouse per engineering
When was the permit issued for 18408 W Oxnard St?
June 25, 2026, by the City of Los Angeles.
Who is building 18408 W Oxnard St?
Commercial West Builders is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 18408 W Oxnard St need now?