191 Vermont Avenue, Staten Island, New York City: School Renovation
Follow this project · we email you when its status or build stage changes

School Renovation at 191 Vermont Avenue, Staten Island, New York City was permitted on July 22, 2026 with a stated construction value of under $1M. Installation of new split AC unit, exhaust fan, refrigerant leak detection system and lighting fixtures in existing school building. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 191 Vermont Avenue, Staten Island, New York City |
| Project | School Renovation |
| Building type | Institutional |
| Work | Renovation or alteration |
| Permit issued | July 22, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Nyc School Construction Authority See the decision makers — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Installation of new split AC unit, exhaust fan, refrigerant leak detection system and lighting fixtures in existing school building”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in New York City once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- May 22, 2026Alteration · under $1M
- July 22, 2026Alteration: School Renovation · under $1M (this page)
- July 31, 2026Alteration: mechanical · under $1M
- August 14, 2026Alteration · under $1M
- August 31, 2026Alteration: roofing · under $1M
- August 2026Estimated construction start (estimate)
- February 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 2 to approach now, 8 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2026 – Feb 2027 | Estimate |
| Construction Site Security | Jul 2026 – Sep 2026 | Window passed (est.) |
| Concrete and Foundation | Jul 2026 – Aug 2026 | Window passed (est.) |
| Structural Steel | Aug 2026 – Sep 2026 | Window passed (est.) |
| Elevators | Aug 2026 – Sep 2026 | Window passed (est.) |
| Framing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Painting | Aug 2026 – Oct 2026 | Approach now |
| Masonry | Aug 2026 – Sep 2026 | Window passed (est.) |
| Waterproofing | Aug 2026 – Sep 2026 | Window passed (est.) |
| Roofing | Aug 2026 – Oct 2026 | Approach now |
| Windows, Doors and Glazing | Aug 2026 – Sep 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (August 2026) to the estimated completion (February 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in New York City
Leads for your trade: Painting leads in New York City · Roofing leads in New York City · every trade in New York City.
More projects: every New York City project of $1M+ by address · major projects in New York City.
Compare tools: The Best Construction Lead Generation Software in New York.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 47-45 156 Street, Queens: Single-Family House Renovation
- 172 Jaffray Street, Brooklyn: Single-Family House Renovation
- 3037 Mickle Avenue, Bronx: Single-Family House Renovation
- 137 West 83 Street, Manhattan: Apartment Building Renovation
- 52 Broadway, Manhattan: Commercial Project Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 191 Vermont Avenue, Staten Island?
School Renovation. Installation of new split AC unit, exhaust fan, refrigerant leak detection system and lighting fixtures in existing school building
When was the permit issued for 191 Vermont Avenue, Staten Island?
July 22, 2026, by New York City.
Who is building 191 Vermont Avenue, Staten Island?
Nyc School Construction Authority is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 191 Vermont Avenue, Staten Island need now?
Estimated as of October 2026, the trades to approach now are painting and roofing. Already passed: site security; concrete; structural steel; elevator; framing; masonry; waterproofing; window, door and glazing.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
