200 Fairbank Ave, Toronto: Industrial Building Renovation
Follow this project · we email you when its status or build stage changes

Industrial Building Renovation at 200 Fairbank Ave, Toronto was permitted on October 5, 2026 with a stated construction value of under $1M. Installation of rooftop solar panels for purpose of power generation. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 200 Fairbank Ave, Toronto |
| Project | Industrial Building Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | October 5, 2026 |
| Stated construction value | under $1M |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Installation of rooftop solar panels for purpose of power generation”
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Toronto once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- April 2, 2026Designated Structures
- October 5, 2026Designated Structures: Industrial Building Renovation ยท under $1M (this page)
- October 2026Estimated construction start (estimate)
- May 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Which trades are being bought now
Builtie stages each project as it moves; the trades open on it change week to week.
Find work like this in Toronto
Leads for your trade: every trade in Toronto.
More projects: every Toronto project of $1M+ by address · major projects in Toronto.
Compare tools: The Best Construction Lead Generation Software in Ontario.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 21 St Clair Ave E: Office and Tenant Fit-Out
- 1876 A Keele St: Residential Project
- 1876 B Keele St: Residential Project
- 120 Town Haven Pl: Apartment Building Renovation
- 277 Victoria St: Residential Project Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 200 Fairbank Ave?
Industrial Building Renovation. Installation of rooftop solar panels for purpose of power generation
When was the permit issued for 200 Fairbank Ave?
October 5, 2026, by the City of Toronto.
Who is building 200 Fairbank Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 200 Fairbank Ave need now?
It depends on the stage; Builtie tracks it.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
