201-15 115 Avenue, Queens, New York City: Institutional Project Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Institutional Project Renovation at 201-15 115 Avenue, Queens, New York City was permitted on August 11, 2026 with a stated construction value of under $1M. Renovate existing library and related spaces - remove existing non-structural partitions - modify suspended ceiling - replace existing interior door - no change in use - no change in occupancy - no change in egress - no change in ventilation. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address201-15 115 Avenue, Queens, New York City
ProjectInstitutional Project Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedAugust 11, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Renovate existing library and related spaces - remove existing non-structural partitions - modify suspended ceiling - replace existing interior door - no change in use - no change in occupancy - no change in egress - no change in ventilation”

Where this project is

  1. July 14, 2026Alteration · under $1M
  2. July 14, 2026Alteration: structural work · under $1M
  3. July 14, 2026Alteration: mechanical · under $1M
  4. August 11, 2026Alteration: Institutional Project Renovation · under $1M (this page)
  5. September 2026Estimated construction start (estimate)
  6. March 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 9 to approach now, 1 passed.

TradeWhen to approach (est.)Status
Construction (est.)Sep 2026 – Mar 2027Estimate
Construction Site SecurityAug 2026 – Oct 2026Approach now
Concrete and FoundationSep 2026Window passed (est.)
Structural SteelSep 2026 – Oct 2026Approach now
ElevatorsSep 2026 – Oct 2026Approach now
FramingSep 2026 – Oct 2026Approach now
PaintingSep 2026 – Nov 2026Approach now
MasonrySep 2026 – Oct 2026Approach now
WaterproofingSep 2026 – Oct 2026Approach now
RoofingSep 2026 – Nov 2026Approach now
Windows, Doors and GlazingSep 2026 – Oct 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 201-15 115 Avenue, Queens?

Institutional Project Renovation. Renovate existing library and related spaces - remove existing non-structural partitions - modify suspended ceiling - replace existing interior door - no change in use - no change in occupancy - no change in egress - no change in ventilation

When was the permit issued for 201-15 115 Avenue, Queens?

August 11, 2026, by New York City.

Who is building 201-15 115 Avenue, Queens?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 201-15 115 Avenue, Queens need now?

Estimated as of October 2026, the trades to approach now are site security; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing. Already passed: concrete.