215-15 36 Avenue, Queens, New York City: 2-Storey Two-Family House

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

2-Storey Two-Family House at 215-15 36 Avenue, Queens, New York City was permitted on June 11, 2026 with a stated construction value of under $1M. New two-family house, 2 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address215-15 36 Avenue, Queens, New York City
Project2-Storey Two-Family House
Building typeResidential
WorkNew building
Storeys2
Permit issuedJune 11, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitAmeriland Brook LLC See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. June 11, 2026New construction: 2-Storey Two-Family House · under $1M (this page)
  2. June 2026Estimated construction start (estimate)
  3. January 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

1 project of $1M+ was filed within 1 km in the last 12 months. See them all in Builtie →

This project   The nearby project, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Ameriland Brook LLC has 113 other projects in Builtie

  • New York City · Alteration CO: conversion to residential · under $1M · 2026
  • New York City · Alteration CO · under $1M · 2026
  • New York City · Alteration CO · under $1M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2026 – Jan 2027Estimate
Construction Site SecurityJun 2026 – Jul 2026Window passed (est.)
Concrete and FoundationJun 2026 – Jul 2026Window passed (est.)
Structural SteelJun 2026 – Jul 2026Window passed (est.)
ElevatorsJun 2026 – Aug 2026Window passed (est.)
FramingJun 2026 – Aug 2026Window passed (est.)
PaintingJul 2026 – Sep 2026Window passed (est.)
MasonryJun 2026 – Jul 2026Window passed (est.)
WaterproofingJun 2026 – Jul 2026Window passed (est.)
RoofingJul 2026 – Aug 2026Window passed (est.)
Windows, Doors and GlazingJul 2026 – Aug 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (January 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 215-15 36 Avenue, Queens?

2-Storey Two-Family House. New two-family house, 2 storeys.

When was the permit issued for 215-15 36 Avenue, Queens?

June 11, 2026, by New York City.

Who is building 215-15 36 Avenue, Queens?

Ameriland Brook LLC is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 215-15 36 Avenue, Queens need now?

Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.