22 Cortlandt Street, Manhattan, New York City: Office and Tenant Fit-Out

Commercial building under construction with a tower crane
Figures read October 25, 2026 from Builtie's permit data.

Office and Tenant Fit-Out at 22 Cortlandt Street, Manhattan, New York City was permitted on July 15, 2026 with a stated construction value of under $1M. Interior renovation on the 32nd floor for commercial office use. Work to include new interior non-load bearing partitions, doors, finishes, and millwork. No change to building egress, use, or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address22 Cortlandt Street, Manhattan, New York City
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedJuly 15, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permit2323 Development Corp See the decision makers — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Interior renovation on the 32nd floor for commercial office use. Work to include new interior non-load bearing partitions, doors, finishes, and millwork. No change to building egress, use, or occupancy”

Where this project is

  1. Since March 20265 other permits at this address
  2. May 13, 2026Interior alteration · $5M to $10M
  3. June 10, 2026Alteration · under $1M
  4. June 10, 2026Alteration: fire protection · under $1M
  5. June 10, 2026Alteration: fire protection · under $1M
  6. July 15, 2026Alteration: Office and Tenant Fit-Out · under $1M (this page)
  7. September 4, 2026Alteration: facade work · under $1M
  8. March 2026Estimated construction start (estimate)
  9. October 2026Estimated completion (estimate)

How we estimate: from the same company's first permit at this address (March 2026) and this permit's stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

85 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Mar 2026 – Oct 2026Estimate
Construction Site SecurityFeb 2026 – Apr 2026Window passed (est.)
Concrete and FoundationMar 2026Window passed (est.)
Structural SteelMar 2026 – Apr 2026Window passed (est.)
ElevatorsMar 2026 – Apr 2026Window passed (est.)
FramingMar 2026 – Apr 2026Window passed (est.)
PaintingMar 2026 – May 2026Window passed (est.)
MasonryMar 2026 – Apr 2026Window passed (est.)
WaterproofingMar 2026 – Apr 2026Window passed (est.)
RoofingApr 2026 – May 2026Window passed (est.)
Windows, Doors and GlazingMar 2026 – May 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (March 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 22 Cortlandt Street, Manhattan?

Office and Tenant Fit-Out. Interior renovation on the 32nd floor for commercial office use. Work to include new interior non-load bearing partitions, doors, finishes, and millwork. No change to building egress, use, or occupancy

When was the permit issued for 22 Cortlandt Street, Manhattan?

July 15, 2026, by New York City.

Who is building 22 Cortlandt Street, Manhattan?

2323 Development Corp is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 22 Cortlandt Street, Manhattan need now?

Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.