22024 W Tulsa St, Los Angeles: 2-Storey Single-Family House
Follow this project · we email you when its status or build stage changes

2-Storey Single-Family House at 22024 W Tulsa St, Los Angeles was permitted on August 26, 2026 with a stated construction value of under $1M. New single-family house, 2 storeys. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 22024 W Tulsa St, Los Angeles |
| Project | 2-Storey Single-Family House |
| Building type | Residential |
| Work | New building |
| Storeys | 2 |
| Permit issued | August 26, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Excavation |
| Company named on the permit | Black Diamond Construction And Management See the decision makers — free trial |
| Decision makers and contacts | See who to contact — free trial |
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Los Angeles once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- August 26, 2026New home: 2-Storey Single-Family House · under $1M (this page)
- August 26, 2026Grading · under $1M
- September 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Black Diamond Construction And Management has 3 other projects in Builtie
- Los Angeles · Grading · under $1M · 2026
- Los Angeles · Grading · under $1M · 2026
- Los Angeles · Grading · under $1M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 7 to approach now, 2 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2026 – Mar 2027 | Estimate |
| Excavation and Site Work | Aug 2026 – Sep 2026 | Window passed (est.) |
| Construction Site Security | Aug 2026 – Oct 2026 | Approach now |
| Concrete and Foundation | Aug 2026 – Sep 2026 | Window passed (est.) |
| Structural Steel | Sep 2026 – Oct 2026 | Approach now |
| Elevators | Sep 2026 – Oct 2026 | Approach now |
| Framing | Sep 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Nov 2026 | Approach now |
| Masonry | Sep 2026 – Oct 2026 | Approach now |
| Waterproofing | Sep 2026 – Oct 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in Los Angeles
Leads for your trade: Construction Site Security leads in Los Angeles · Structural Steel leads in Los Angeles · Elevators leads in Los Angeles · Framing leads in Los Angeles · every trade in Los Angeles.
More projects: every Los Angeles project of $1M+ by address · major projects in Los Angeles.
Compare tools: The Best Construction Lead Generation Software in California.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Los Angeles
- 22020 W Tulsa St: 2-Storey Single-Family House
- 22012 W Tulsa St: 2-Storey Single-Family House
- 11106 S Avalon Blvd: 2-Storey Single-Family House
- 1838 1/2 S Thayer Ave: 4-Storey Single-Family House
- 1840 S Thayer Ave: 4-Storey Single-Family House
All of them: construction projects in Los Angeles by address. The data is the City of Los Angeles: the building permits the Department of Building and Safety (LADBS) issues. Santa Monica, Burbank, Long Beach and most other cities in Los Angeles County issue their own permits and are not in the feed today; Pasadena, Glendale and unincorporated Los Angeles County have been read separately since October 2026. The city's open dataset names no contractor, so Builtie reads each permit's LADBS record for the contractor and their CSLB license, the architect and the engineer. Many Los Angeles permits are owner-builder, and on those the architect is the first contact.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 22024 W Tulsa St?
2-Storey Single-Family House. New single-family house, 2 storeys.
When was the permit issued for 22024 W Tulsa St?
August 26, 2026, by the City of Los Angeles.
Who is building 22024 W Tulsa St?
Black Diamond Construction And Management is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 22024 W Tulsa St need now?
Estimated as of October 2026, the trades to approach now are site security, structural steel, elevator, framing, painting, masonry and waterproofing. Already passed: excavation and site work; concrete.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
