225 Wellesley St E, Toronto: Utility Facility Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Utility Facility Renovation at 225 Wellesley St E, Toronto was permitted on October 8, 2025 with a stated construction value of under $1M. Proposal for localized garage roof deck repairs including new hot applied waterproofing and concrete repairs. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address225 Wellesley St E, Toronto
NeighbourhoodCabbagetown-South St.James Town
ProjectUtility Facility Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedOctober 8, 2025
Stated construction valueunder $1M
Estimated stageLikely complete
Company named on the permitWillowfield Homes
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for localized garage roof deck repairs including new hot applied waterproofing and concrete repairs”

Where this project is

  1. Since February 20073 other permits at this address
  2. January 8, 2010Plumbing
  3. January 8, 2010Mechanical: plumbing
  4. June 1, 2010Plumbing: structural work · under $1M
  5. June 9, 2010Plumbing
  6. April 5, 2019Addition or alteration · under $1M
  7. October 8, 2025Addition or alteration: Utility Facility Renovation · under $1M (this page)
  8. October 2025Estimated construction start (estimate)
  9. May 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 4 more renovations within 1 km

  • 325 Gerrard St EAddition or alteration: excavation and shoring · $100M to $250M · November 2025
  • 227 Gerrard St ENew building · $25M to $50M · October 2025
  • 120 Bloor St EAddition or alteration: interior alteration · $1M to $5M · December 2025
  • 130 Carlton StAddition or alteration: roofing · $1M to $5M · April 2026
  • 550 Ontario StAddition or alteration: roofing · $1M to $5M · January 2026

10 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

Builtie stages each project as it moves; the trades open on it change week to week.

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 225 Wellesley St E?

Utility Facility Renovation. Proposal for localized garage roof deck repairs including new hot applied waterproofing and concrete repairs

When was the permit issued for 225 Wellesley St E?

October 8, 2025, by the City of Toronto.

Who is building 225 Wellesley St E?

Willowfield Homes is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 225 Wellesley St E need now?

It depends on the stage; Builtie tracks it.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.