25 East 11 Street, Manhattan, New York City: Single-Family House Renovation

Newly built homes under construction on a residential street
Figures read October 25, 2026 from Builtie's permit data.

Single-Family House Renovation at 25 East 11 Street, Manhattan, New York City was permitted on April 15, 2026 with a stated construction value of $10M to $25M. Renovation or addition to a single-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address25 East 11 Street, Manhattan, New York City
ProjectSingle-Family House Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedApril 15, 2026
Stated construction value$10M to $25M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

Where this project is

  1. April 15, 2026Alteration CO: Single-Family House Renovation · $10M to $25M (this page)
  2. August 20, 2026Alteration: site protection · under $1M
  3. June 2026Estimated construction start (estimate)
  4. December 2027Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 20 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 301 East 17 Street, ManhattanAlteration: mechanical · $100M to $250M · June 2026
  • 122 5 Avenue, ManhattanInterior alteration · $10M to $25M · April 2026
  • 1 Madison Avenue, ManhattanAlteration: plumbing · $10M to $25M · October 2026
  • 200 Fifth Avenue, ManhattanAlteration: mechanical · $10M to $25M · June 2026
  • 171 5 Avenue, ManhattanAlteration CO: mechanical · $10M to $25M · June 2026

96 projects of $1M+ were filed within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

The company behind this project has 4 other projects in Builtie

  • New York City · Alteration: demolition · under $1M · 2026
  • New York City · Interior alteration · under $1M · 2026
  • New York City · Alteration: plumbing · under $1M · 2026

Reveal the builder — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 5 to approach now, 5 passed.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2026 – Dec 2027Estimate
Construction Site SecurityApr 2026 – Sep 2026Window passed (est.)
Concrete and FoundationMay 2026 – Jul 2026Window passed (est.)
Structural SteelJun 2026 – Sep 2026Window passed (est.)
ElevatorsJun 2026 – Oct 2026Approach now
FramingJun 2026 – Oct 2026Approach now
PaintingJul 2026 – Dec 2026Approach now
MasonryJun 2026 – Sep 2026Window passed (est.)
WaterproofingJun 2026 – Sep 2026Window passed (est.)
RoofingAug 2026 – Nov 2026Approach now
Windows, Doors and GlazingJul 2026 – Oct 2026Approach now

How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2027) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 25 East 11 Street, Manhattan?

Single-Family House Renovation. Renovation or addition to a single-family house.

When was the permit issued for 25 East 11 Street, Manhattan?

April 15, 2026, by New York City.

Who is building 25 East 11 Street, Manhattan?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 25 East 11 Street, Manhattan need now?

Estimated as of October 2026, the trades to approach now are elevator; framing; painting; roofing; window, door and glazing. Already passed: site security, concrete, structural steel, masonry and waterproofing.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.