2529 Adam Clayton Powell Jr Boulevard, Manhattan, New York City: 6-Storey Apartment Building Renovation

6-Storey Apartment Building Renovation at 2529 Adam Clayton Powell Jr Boulevard, Manhattan, New York City was permitted on August 5, 2026 with a stated construction value of under $1M. Mechanical work in conjunction with renovation of 6-story nycha multiple dwelling throughout:installation of new air-conditioning systems, ventilation systems and miscellanceous hvac work; no changes to use, egress, or occupancy. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2529 Adam Clayton Powell Jr Boulevard, Manhattan, New York City |
| Project | 6-Storey Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | August 5, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Mechanical work in conjunction with renovation of 6-story nycha multiple dwelling throughout:installation of new air-conditioning systems, ventilation systems and miscellanceous hvac work; no changes to use, egress, or occupancy”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- May 26, 2026Alteration: mechanical · under $1M
- August 5, 2026Alteration: 6-Storey Apartment Building Renovation · under $1M (this page)
- September 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 103 West 141 Street, ManhattanAlteration CO: structural work · $10M to $25M · April 2026
- 2581 Adam Clayton Powell Jr Boulevard, ManhattanAlteration: roofing · $5M to $10M · September 2026
- 301 West 140 Street, ManhattanAlteration · $5M to $10M · September 2026
- 102 Bradhurst Avenue, ManhattanAlteration: facade work · $5M to $10M · March 2026
- 2441 Adam Clayton Powell Jr Boulevard, ManhattanInterior alteration · $5M to $10M · October 2026
18 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 9 to approach now, 1 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2026 – Mar 2027 | Estimate |
| Construction Site Security | Aug 2026 – Oct 2026 | Approach now |
| Concrete and Foundation | Aug 2026 – Sep 2026 | Window passed (est.) |
| Structural Steel | Sep 2026 – Oct 2026 | Approach now |
| Elevators | Sep 2026 – Oct 2026 | Approach now |
| Framing | Sep 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Nov 2026 | Approach now |
| Masonry | Sep 2026 – Oct 2026 | Approach now |
| Waterproofing | Sep 2026 – Oct 2026 | Approach now |
| Roofing | Sep 2026 – Oct 2026 | Approach now |
| Windows, Doors and Glazing | Sep 2026 – Oct 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 2525 Adam Clayton Powell Jr Boulevard, Manhattan: 6-Storey Apartment Building Renovation
- 2533 Adam Clayton Powell Jr Boulevard, Manhattan: 6-Storey Apartment Building Renovation
- 103 East 75 Street, Manhattan: Apartment Building Renovation
- 408 East 94 Street, Brooklyn: 2-Storey Office-to-Residential Conversion
- 221 West 230 Street, Bronx: Office and Tenant Fit-Out
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2529 Adam Clayton Powell Jr Boulevard, Manhattan?
6-Storey Apartment Building Renovation. Mechanical work in conjunction with renovation of 6-story nycha multiple dwelling throughout:installation of new air-conditioning systems, ventilation systems and miscellanceous hvac work; no changes to use, egress, or occupancy
When was the permit issued for 2529 Adam Clayton Powell Jr Boulevard, Manhattan?
August 5, 2026, by New York City.
Who is building 2529 Adam Clayton Powell Jr Boulevard, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2529 Adam Clayton Powell Jr Boulevard, Manhattan need now?
Estimated as of October 2026, the trades to approach now are site security; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing. Already passed: concrete.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
