2546 Hylan Boulevard, Staten Island, New York City: Healthcare Building Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Healthcare Building Renovation at 2546 Hylan Boulevard, Staten Island, New York City was permitted on April 30, 2026 with a stated construction value of under $1M. Interior renovation of an existing shell space with some exterior modifications to the building facade into a emergency veterinarian hospital. Change of use on schedule A. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address2546 Hylan Boulevard, Staten Island, New York City
ProjectHealthcare Building Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedApril 30, 2026
Stated construction valueunder $1M
Estimated stageFoundation
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Interior renovation of an existing shell space with some exterior modifications to the building facade into a emergency veterinarian hospital. Change of use on schedule A”

Where this project is

  1. March 23, 2026Alteration: roofing · under $1M
  2. March 23, 2026Alteration: roofing · under $1M
  3. April 1, 2026Alteration CO: facade work · under $1M
  4. April 1, 2026Alteration: mechanical · under $1M
  5. April 30, 2026Alteration CO: Healthcare Building Renovation · under $1M (this page)
  6. May 2026Estimated construction start (estimate)
  7. November 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

4 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–3, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

The company behind this project has 31 other projects in Builtie

  • New York City · Alteration CO: interior alteration · $5M to $10M · 2026
  • New York City · Alteration · $1M to $5M · 2026
  • New York City · Interior alteration · $1M to $5M · 2026

Reveal the builder — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)May 2026 – Nov 2026Estimate
Construction Site SecurityMay 2026 – Jun 2026Window passed (est.)
Concrete and FoundationMay 2026 – Jun 2026Window passed (est.)
Structural SteelMay 2026 – Jun 2026Window passed (est.)
ElevatorsMay 2026 – Jul 2026Window passed (est.)
FramingMay 2026 – Jul 2026Window passed (est.)
PaintingJun 2026 – Aug 2026Window passed (est.)
MasonryMay 2026 – Jun 2026Window passed (est.)
WaterproofingMay 2026 – Jun 2026Window passed (est.)
RoofingJun 2026 – Jul 2026Window passed (est.)
Windows, Doors and GlazingJun 2026 – Jul 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (May 2026) to the estimated completion (November 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in New York City

All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 2546 Hylan Boulevard, Staten Island?

Healthcare Building Renovation. Interior renovation of an existing shell space with some exterior modifications to the building facade into a emergency veterinarian hospital. Change of use on schedule A

When was the permit issued for 2546 Hylan Boulevard, Staten Island?

April 30, 2026, by New York City.

Who is building 2546 Hylan Boulevard, Staten Island?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 2546 Hylan Boulevard, Staten Island need now?

Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.