28 Oki Dr NW, Calgary: Parking Structure Renovation

Parking Structure Renovation at 28 Oki Dr NW, Calgary was permitted on June 18, 2026 with a stated construction value of $1M to $5M. AHS - ACH Lot 1 Parkade Maintenance. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 28 Oki Dr NW, Calgary |
| Project | Parking Structure Renovation |
| Building type | Industrial |
| Work | Renovation or alteration |
| Permit issued | June 18, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “AHS - ACH Lot 1 Parkade Maintenance”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 1807 33 Av SW: School
- 1121 12 Av SW: School
- 2222r 23 Av NW: School
- 3412r 4 St NW: School
- 2231 81 St SW: Townhomes
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 28 Oki Dr NW?
Parking Structure Renovation. AHS - ACH Lot 1 Parkade Maintenance
When was the permit issued for 28 Oki Dr NW?
June 18, 2026, by the City of Calgary.
Who is building 28 Oki Dr NW?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 28 Oki Dr NW need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
