283 Platinum Avenue, Staten Island, New York City: Office and Tenant Fit-Out

Office and Tenant Fit-Out at 283 Platinum Avenue, Staten Island, New York City was permitted on May 22, 2026 with a stated construction value of under $1M. Nterior tenant fitout renovation of an existing landlord provided shell for one story single tenant retail space. work includes new interior partitions, doors, hardware, and interior finishes. no change to use occupancy or egress. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 283 Platinum Avenue, Staten Island, New York City |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | May 22, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Nterior tenant fitout renovation of an existing landlord provided shell for one story single tenant retail space. work includes new interior partitions, doors, hardware, and interior finishes. no change to use occupancy or egress”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- May 13, 2026Interior alteration · under $1M
- May 19, 2026Alteration: structural work · under $1M
- May 22, 2026Alteration: Office and Tenant Fit-Out · under $1M (this page)
- June 10, 2026Alteration: fire protection · under $1M
- August 3, 2026Interior alteration · under $1M
- June 2026Estimated construction start (estimate)
- December 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby: 3 more renovations within 1 km
- 2500 Richmond Avenue, Staten IslandAlteration: plumbing · $5M to $10M · May 2026
- 2655 Richmond Avenue, Staten IslandInterior alteration · $1M to $5M · October 2026
- 100 Essex Drive, Staten IslandAlteration · $1M to $5M · June 2026
3 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
The company behind this project has 31 other projects in Builtie
- ████████ ConstructionNew York City · Alteration CO: interior alteration · $5M to $10M · 2026
- ████████ ConstructionNew York City · Alteration · $1M to $5M · 2026
- ████████ ConstructionNew York City · Interior alteration · $1M to $5M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2026 – Dec 2026 | Estimate |
| Construction Site Security | Jun 2026 – Jul 2026 | Window passed (est.) |
| Concrete and Foundation | Jun 2026 | Window passed (est.) |
| Structural Steel | Jun 2026 – Jul 2026 | Window passed (est.) |
| Elevators | Jun 2026 – Jul 2026 | Window passed (est.) |
| Framing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Painting | Jun 2026 – Aug 2026 | Window passed (est.) |
| Masonry | Jun 2026 – Jul 2026 | Window passed (est.) |
| Waterproofing | Jun 2026 – Jul 2026 | Window passed (est.) |
| Roofing | Jul 2026 – Aug 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Jun 2026 – Aug 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2026) to the estimated completion (December 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 170 South 2 Street, Brooklyn: Apartment Building Renovation
- 72-02 31 Avenue, Queens: Restaurant Renovation
- 234 West 44 Street, Manhattan: Restaurant Renovation
- 541 Clarkson Avenue, Brooklyn: Utility Facility Renovation
- 441 East Fordham Road, Bronx: Office and Tenant Fit-Out
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 283 Platinum Avenue, Staten Island?
Office and Tenant Fit-Out. Nterior tenant fitout renovation of an existing landlord provided shell for one story single tenant retail space. work includes new interior partitions, doors, hardware, and interior finishes. no change to use occupancy or egress
When was the permit issued for 283 Platinum Avenue, Staten Island?
May 22, 2026, by New York City.
Who is building 283 Platinum Avenue, Staten Island?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 283 Platinum Avenue, Staten Island need now?
Estimated from the permit date, the award windows for site security; concrete; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.