2856 E 19th Avenue, Vancouver: Apartment Building

Apartment Building at 2856 E 19th Avenue, Vancouver was permitted on July 23, 2025 with a stated construction value of $1M to $5M. High Density Housing / Commercial - New Building - MULTIPLEX:********Part 5 ********************************* To construct a three storey multiple dwelling building containing three dwelling units and three surface parking spaces at the rear having vehicular… Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 2856 E 19th Avenue, Vancouver |
| Project | Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | July 23, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “High Density Housing / Commercial - New Building - MULTIPLEX:********Part 5 ********************************* To construct a three storey multiple dwelling building containing three dwelling units and three surface parking spaces at the rear having vehicular…”
Which trades are being bought now
The project is with the mechanical, electrical and interior trades at work. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Fire Protection | 25% to 50% |
| Signage and Wayfinding | 25% to 70% |
| Insulation | 30% to 55% |
| Drywall | 35% to 60% |
| Low Voltage and Data | 35% to 60% |
| Tile | 45% to 65% |
| Cabinetry and Millwork | 50% to 70% |
| Flooring | 50% to 70% |
| Countertops | 55% to 75% |
| Finish Carpentry | 55% to 75% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Vancouver
- 100 W 49th Avenue: Campus Building Renovation
- 1070 Le Roi Street: Apartment Building
- 1111 Haro Street: Apartment Building Renovation
- 1225 Robson Street: Hotel Renovation
- 1429 E 4th Avenue: 3-Storey Apartment Building Renovation
All of them: construction projects in Vancouver by address. The data is the City of Vancouver. Burnaby, Richmond, Surrey and the rest of Metro Vancouver issue their own permits and are not in the feed today.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 2856 E 19th Avenue?
Apartment Building. High Density Housing / Commercial - New Building - MULTIPLEX:********Part 5 ********************************* To construct a three storey multiple dwelling building containing three dwelling units and three surface parking spaces at the rear having vehicular…
When was the permit issued for 2856 E 19th Avenue?
July 23, 2025, by the City of Vancouver.
Who is building 2856 E 19th Avenue?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 2856 E 19th Avenue need now?
At its current stage: fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
