30 Danesbury Ave, Toronto: Residential Project Renovation

Residential Project Renovation at 30 Danesbury Ave, Toronto was permitted on February 4, 2026 with a stated construction value of under $1M. Addition to existing basement and first floor, new second and third floor additions. Rear balconies, stairs and underpinning of existing basement. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 30 Danesbury Ave, Toronto |
| Neighbourhood | Briar Hill-Belgravia |
| Project | Residential Project Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | February 4, 2026 |
| Housing units | 4 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Addition to existing basement and first floor, new second and third floor additions. Rear balconies, stairs and underpinning of existing basement”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since February 20261 other permit at this address
- February 4, 2026Small Residential Projects: Residential Project Renovation · under $1M (this page)
- March 6, 2026Mechanical: excavation and shoring
- March 31, 2026Plumbing: excavation and shoring
- April 1, 2026Drains and site services: excavation and shoring
- June 2, 2026Drains and site services
- June 2, 2026Small Residential Projects · under $1M
- February 2026Estimated construction start (estimate)
- September 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 796 Glencairn AveNew construction · $1M to $5M · May 2026
- 313 Hillmount AveNew construction · $1M to $5M · August 2026
- 560 Atlas AveNew construction: demolition · $1M to $5M · May 2026
- 113 Alameda AveNew building · $1M to $5M · January 2026
9 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Feb 2026 – Sep 2026 | Estimate |
| Fire Protection | Mar 2026 – Apr 2026 | Window passed (est.) |
| Signage and Wayfinding | May 2026 – Jun 2026 | Window passed (est.) |
| Insulation | Mar 2026 – May 2026 | Window passed (est.) |
| Drywall | Apr 2026 – May 2026 | Window passed (est.) |
| Low Voltage and Data | Apr 2026 – May 2026 | Window passed (est.) |
| Tile | Apr 2026 – May 2026 | Window passed (est.) |
| Cabinetry and Millwork | Apr 2026 – May 2026 | Window passed (est.) |
| Flooring | Apr 2026 – May 2026 | Window passed (est.) |
| Countertops | Apr 2026 – May 2026 | Window passed (est.) |
| Finish Carpentry | Apr 2026 – May 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (February 2026) to the estimated completion (September 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 855 Roselawn Ave: Apartment Building Renovation
- 2306 St Clair Ave W: Office and Tenant Fit-Out
- 102 Tyndall Ave: Apartment Building Renovation
- 4530 Eglinton Ave W: Transit Facility Renovation
- 2088 Lawrence Ave E: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 30 Danesbury Ave?
Residential Project Renovation. Addition to existing basement and first floor, new second and third floor additions. Rear balconies, stairs and underpinning of existing basement
When was the permit issued for 30 Danesbury Ave?
February 4, 2026, by the City of Toronto.
Who is building 30 Danesbury Ave?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 30 Danesbury Ave need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.