855 Roselawn Ave, Toronto: Apartment Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Apartment Building Renovation at 855 Roselawn Ave, Toronto was permitted on June 11, 2025 with a stated construction value of under $1M. Replacement of DCW piping, riser isolation valves and in-suite valves and fixtures. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address855 Roselawn Ave, Toronto
NeighbourhoodBriar Hill-Belgravia
ProjectApartment Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedJune 11, 2025
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitMartinway Contracting Limited
Decision makers and contactsSee who to contact — free trial

From the permit: “Replacement of DCW piping, riser isolation valves and in-suite valves and fixtures”

Where this project is

  1. Since May 20148 other permits at this address
  2. January 20, 2021Addition or alteration: interior alteration · under $1M
  3. January 20, 2021Plumbing
  4. January 20, 2021Mechanical
  5. December 21, 2022Addition or alteration: interior alteration · under $1M
  6. December 21, 2022Plumbing
  7. June 11, 2025Plumbing: Apartment Building Renovation · under $1M (this page)
  8. July 2025Estimated construction start (estimate)
  9. January 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 796 Glencairn AveNew construction · $1M to $5M · May 2026
  • 313 Hillmount AveNew construction · $1M to $5M · August 2026
  • 560 Atlas AveNew construction: demolition · $1M to $5M · May 2026
  • 113 Alameda AveNew building · $1M to $5M · January 2026

11 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–4, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Martinway Contracting Limited has 15 other projects in Builtie

  • Toronto · Fire and life safety: addition · $10M to $25M · 1997
  • Toronto · Addition or alteration: plumbing · $1M to $5M · 2026
  • Toronto · Addition or alteration: elevator · $1M to $5M · 2026

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jul 2025 – Jan 2026Estimate
Fire ProtectionAug 2025 – Sep 2025Window passed (est.)
Signage and WayfindingSep 2025 – Nov 2025Window passed (est.)
InsulationAug 2025 – Sep 2025Window passed (est.)
DrywallAug 2025 – Oct 2025Window passed (est.)
Low Voltage and DataAug 2025 – Oct 2025Window passed (est.)
TileSep 2025 – Oct 2025Window passed (est.)
Cabinetry and MillworkAug 2025 – Oct 2025Window passed (est.)
FlooringSep 2025 – Oct 2025Window passed (est.)
CountertopsSep 2025 – Oct 2025Window passed (est.)
Finish CarpentrySep 2025 – Oct 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (July 2025) to the estimated completion (January 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 855 Roselawn Ave?

Apartment Building Renovation. Replacement of DCW piping, riser isolation valves and in-suite valves and fixtures

When was the permit issued for 855 Roselawn Ave?

June 11, 2025, by the City of Toronto.

Who is building 855 Roselawn Ave?

Martinway Contracting Limited is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 855 Roselawn Ave need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.