855 Roselawn Ave, Toronto: Apartment Building Renovation

Apartment Building Renovation at 855 Roselawn Ave, Toronto was permitted on June 11, 2025 with a stated construction value of under $1M. Replacement of DCW piping, riser isolation valves and in-suite valves and fixtures. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 855 Roselawn Ave, Toronto |
| Neighbourhood | Briar Hill-Belgravia |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | June 11, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Martinway Contracting Limited |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Replacement of DCW piping, riser isolation valves and in-suite valves and fixtures”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since May 20148 other permits at this address
- January 20, 2021Addition or alteration: interior alteration · under $1M
- January 20, 2021Plumbing
- January 20, 2021Mechanical
- December 21, 2022Addition or alteration: interior alteration · under $1M
- December 21, 2022Plumbing
- June 11, 2025Plumbing: Apartment Building Renovation · under $1M (this page)
- July 2025Estimated construction start (estimate)
- January 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 796 Glencairn AveNew construction · $1M to $5M · May 2026
- 313 Hillmount AveNew construction · $1M to $5M · August 2026
- 560 Atlas AveNew construction: demolition · $1M to $5M · May 2026
- 113 Alameda AveNew building · $1M to $5M · January 2026
11 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Martinway Contracting Limited has 15 other projects in Builtie
- Toronto · Fire and life safety: addition · $10M to $25M · 1997
- Toronto · Addition or alteration: plumbing · $1M to $5M · 2026
- Toronto · Addition or alteration: elevator · $1M to $5M · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jul 2025 – Jan 2026 | Estimate |
| Fire Protection | Aug 2025 – Sep 2025 | Window passed (est.) |
| Signage and Wayfinding | Sep 2025 – Nov 2025 | Window passed (est.) |
| Insulation | Aug 2025 – Sep 2025 | Window passed (est.) |
| Drywall | Aug 2025 – Oct 2025 | Window passed (est.) |
| Low Voltage and Data | Aug 2025 – Oct 2025 | Window passed (est.) |
| Tile | Sep 2025 – Oct 2025 | Window passed (est.) |
| Cabinetry and Millwork | Aug 2025 – Oct 2025 | Window passed (est.) |
| Flooring | Sep 2025 – Oct 2025 | Window passed (est.) |
| Countertops | Sep 2025 – Oct 2025 | Window passed (est.) |
| Finish Carpentry | Sep 2025 – Oct 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (July 2025) to the estimated completion (January 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 30 Danesbury Ave: Residential Project Renovation
- 2911 Bayview Ave: Apartment Building Renovation
- 150 Sherbourne St: Office and Tenant Fit-Out
- 745 The Queensway: Office and Tenant Fit-Out
- 500 Avenue Rd: Apartment Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 855 Roselawn Ave?
Apartment Building Renovation. Replacement of DCW piping, riser isolation valves and in-suite valves and fixtures
When was the permit issued for 855 Roselawn Ave?
June 11, 2025, by the City of Toronto.
Who is building 855 Roselawn Ave?
Martinway Contracting Limited is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 855 Roselawn Ave need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.