3100 27 St NE, Calgary: Warehouse

Warehouse at 3100 27 St NE, Calgary was permitted on April 8, 2026 with a stated construction value of $1M to $5M. Group F2 Industrial 3.2.2.81. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 3100 27 St NE, Calgary |
| Project | Warehouse |
| Building type | Commercial |
| Work | New building |
| Permit issued | April 8, 2026 |
| Stated construction value | $1M to $5M |
| Estimated stage | Foundation |
| Company named on the permit | Resolved in Builtie |
| Decision makers and contacts | In Builtie |
From the permit: “Group F2 Industrial 3.2.2.81”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 344 12 Av SW: School
- 1433 9 Av SE: 4-Storey Mixed-Use Building
- 25 Red Embers Pz NE: Institutional Project
- 608 9 Av SW: Parking Structure Renovation
- 10830 42 St NE: Warehouse
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 3100 27 St NE?
Warehouse. Group F2 Industrial 3.2.2.81
When was the permit issued for 3100 27 St NE?
April 8, 2026, by the City of Calgary.
Who is building 3100 27 St NE?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 3100 27 St NE need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
