325 Front St W, Toronto: Office and Tenant Fit-Out

Street view near 325 Front St W, Toronto
Street view near this address, photographed January 2019 before the permit. Photo: Sikander Iqbal, CC BY-SA 4.0, via Wikimedia Commons. Figures read October 24, 2026 from Builtie's permit data.

More photos of this address 5

Office and Tenant Fit-Out at 325 Front St W, Toronto was permitted on May 22, 2025 with a stated construction value of under $1M. Proposal to construct partitions, construct a ramp and create new office space in a vacant space. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address325 Front St W, Toronto
NeighbourhoodHarbourfront-CityPlace
ProjectOffice and Tenant Fit-Out
Building typeCommercial
WorkRenovation or alteration
Permit issuedMay 22, 2025
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitOxford Properties Group
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal to construct partitions, construct a ramp and create new office space in a vacant space”

Where this project is

  1. Since August 20183 other permits at this address
  2. August 2, 2018Mechanical
  3. December 13, 2023Addition or alteration · under $1M
  4. December 18, 2023Mechanical
  5. May 22, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
  6. May 23, 2025Mechanical: demolition
  7. May 23, 2025Plumbing
  8. June 2025Estimated construction start (estimate)
  9. December 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 4 more renovations within 1 km

  • 120 Peter StMechanical · $100M to $250M · March 2026
  • 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
  • 462 Wellington St WAddition or alteration: structural work · $50M to $100M · November 2025
  • 40 Bay StAddition or alteration: elevator · $25M to $50M · April 2026
  • 230 Front St WAddition or alteration: interior alteration · $25M to $50M · June 2026

40 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Oxford Properties Group has 3 other projects in Builtie

  • Toronto · Fire and life safety: interior alteration · under $1M · 2026
  • Toronto · Fire and life safety: interior alteration · under $1M · 2026
  • Toronto · Addition or alteration: interior alteration · under $1M · 2025

See its projects in Builtie — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2025 – Dec 2025Estimate
Fire ProtectionJul 2025 – Aug 2025Window passed (est.)
Signage and WayfindingSep 2025 – Oct 2025Window passed (est.)
InsulationJul 2025 – Sep 2025Window passed (est.)
DrywallAug 2025 – Sep 2025Window passed (est.)
Low Voltage and DataAug 2025 – Sep 2025Window passed (est.)
TileAug 2025 – Sep 2025Window passed (est.)
Cabinetry and MillworkAug 2025 – Sep 2025Window passed (est.)
FlooringAug 2025 – Sep 2025Window passed (est.)
CountertopsAug 2025 – Sep 2025Window passed (est.)
Finish CarpentryAug 2025 – Sep 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2025) to the estimated completion (December 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 325 Front St W?

Office and Tenant Fit-Out. Proposal to construct partitions, construct a ramp and create new office space in a vacant space

When was the permit issued for 325 Front St W?

May 22, 2025, by the City of Toronto.

Who is building 325 Front St W?

Oxford Properties Group is named on the permit. The decision makers and their contacts are in Builtie.

Which trades does 325 Front St W need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.