325 Front St W, Toronto: Office and Tenant Fit-Out

More photos of this address 5

Sikander IqbalCC BY-SA 4.0 · Commons

Chris WoodrichCC BY-SA 4.0 · Commons

Dillan PayneCC BY-SA 4.0 · Commons

Dillan PayneCC BY-SA 4.0 · Commons

Ferdinand Stöhr fellowferdiCC0 · Commons
Office and Tenant Fit-Out at 325 Front St W, Toronto was permitted on May 22, 2025 with a stated construction value of under $1M. Proposal to construct partitions, construct a ramp and create new office space in a vacant space. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 325 Front St W, Toronto |
| Neighbourhood | Harbourfront-CityPlace |
| Project | Office and Tenant Fit-Out |
| Building type | Commercial |
| Work | Renovation or alteration |
| Permit issued | May 22, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Oxford Properties Group |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal to construct partitions, construct a ramp and create new office space in a vacant space”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since August 20183 other permits at this address
- August 2, 2018Mechanical
- December 13, 2023Addition or alteration · under $1M
- December 18, 2023Mechanical
- May 22, 2025Addition or alteration: Office and Tenant Fit-Out · under $1M (this page)
- May 23, 2025Mechanical: demolition
- May 23, 2025Plumbing
- June 2025Estimated construction start (estimate)
- December 2025Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 120 Peter StMechanical · $100M to $250M · March 2026
- 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
- 462 Wellington St WAddition or alteration: structural work · $50M to $100M · November 2025
- 40 Bay StAddition or alteration: elevator · $25M to $50M · April 2026
- 230 Front St WAddition or alteration: interior alteration · $25M to $50M · June 2026
40 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Oxford Properties Group has 3 other projects in Builtie
- Toronto · Fire and life safety: interior alteration · under $1M · 2026
- Toronto · Fire and life safety: interior alteration · under $1M · 2026
- Toronto · Addition or alteration: interior alteration · under $1M · 2025
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Jun 2025 – Dec 2025 | Estimate |
| Fire Protection | Jul 2025 – Aug 2025 | Window passed (est.) |
| Signage and Wayfinding | Sep 2025 – Oct 2025 | Window passed (est.) |
| Insulation | Jul 2025 – Sep 2025 | Window passed (est.) |
| Drywall | Aug 2025 – Sep 2025 | Window passed (est.) |
| Low Voltage and Data | Aug 2025 – Sep 2025 | Window passed (est.) |
| Tile | Aug 2025 – Sep 2025 | Window passed (est.) |
| Cabinetry and Millwork | Aug 2025 – Sep 2025 | Window passed (est.) |
| Flooring | Aug 2025 – Sep 2025 | Window passed (est.) |
| Countertops | Aug 2025 – Sep 2025 | Window passed (est.) |
| Finish Carpentry | Aug 2025 – Sep 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (June 2025) to the estimated completion (December 2025) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 361 Front St W: Apartment Building Renovation
- 123 Front St W: Warehouse Renovation
- 500 Lake Shore Blvd W: Restaurant Renovation
- 350 Queens Quay: Hotel Renovation
- 545 Lake Shore Blvd W: Affordable Housing Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 325 Front St W?
Office and Tenant Fit-Out. Proposal to construct partitions, construct a ramp and create new office space in a vacant space
When was the permit issued for 325 Front St W?
May 22, 2025, by the City of Toronto.
Who is building 325 Front St W?
Oxford Properties Group is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 325 Front St W need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
