361 Front St W, Toronto: Apartment Building Renovation

Apartment Building Renovation at 361 Front St W, Toronto was permitted on August 13, 2025 with a stated construction value of under $1M. Proposal for concrete balconies localized repairs, waterproofing and painting. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 361 Front St W, Toronto |
| Neighbourhood | Harbourfront-CityPlace |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | August 13, 2025 |
| Stated construction value | under $1M |
| Estimated stage | Sub-trades |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Proposal for concrete balconies localized repairs, waterproofing and painting”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- May 15, 2003Mechanical
- May 15, 2003Plumbing
- February 20, 2013Addition or alteration
- August 13, 2025Addition or alteration: Apartment Building Renovation · under $1M (this page)
- September 2025Estimated construction start (estimate)
- March 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 4 more renovations within 1 km
- 120 Peter StMechanical · $100M to $250M · March 2026
- 77 King St WAddition or alteration: interior alteration · $100M to $250M · May 2026
- 462 Wellington St WAddition or alteration: structural work · $50M to $100M · November 2025
- 230 Front St WAddition or alteration: interior alteration · $25M to $50M · June 2026
- 530 Front St WAddition or alteration: fire protection · $25M to $50M · July 2026
28 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2025 – Mar 2026 | Estimate |
| Fire Protection | Oct 2025 – Nov 2025 | Window passed (est.) |
| Signage and Wayfinding | Nov 2025 – Jan 2026 | Window passed (est.) |
| Insulation | Oct 2025 – Nov 2025 | Window passed (est.) |
| Drywall | Oct 2025 – Dec 2025 | Window passed (est.) |
| Low Voltage and Data | Oct 2025 – Dec 2025 | Window passed (est.) |
| Tile | Nov 2025 – Dec 2025 | Window passed (est.) |
| Cabinetry and Millwork | Oct 2025 – Dec 2025 | Window passed (est.) |
| Flooring | Nov 2025 – Dec 2025 | Window passed (est.) |
| Countertops | Nov 2025 – Dec 2025 | Window passed (est.) |
| Finish Carpentry | Nov 2025 – Dec 2025 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (September 2025) to the estimated completion (March 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 325 Front St W: Office and Tenant Fit-Out
- 123 Front St W: Warehouse Renovation
- 500 Lake Shore Blvd W: Restaurant Renovation
- 350 Queens Quay: Hotel Renovation
- 545 Lake Shore Blvd W: Affordable Housing Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 361 Front St W?
Apartment Building Renovation. Proposal for concrete balconies localized repairs, waterproofing and painting
When was the permit issued for 361 Front St W?
August 13, 2025, by the City of Toronto.
Who is building 361 Front St W?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 361 Front St W need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.