333 Las Casas Ave, Pacific Palisades: New single-family home After the 2025 Fire

New single-family home at 333 Las Casas Ave, Pacific Palisades, after the January 2025 Palisades Fire: the City of Los Angeles issued the building permit on August 18, 2026 with a stated construction value of $1M to $5M, and the rebuild is at the foundation stage (Builtie's estimate). Builtie tracks every Palisades rebuild permit, the stage of each build and the builder behind it.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The rebuild
| Address | 333 Las Casas Ave, Pacific Palisades, Los Angeles, CA |
| City permit address | 333 N Las Casas Ave |
| Rebuild | New single-family home |
| What the plans show | 2 storeys, attached garage, fire sprinklers throughout |
| Rebuild track | Like-for-like rebuild (the City's expedited track under Emergency Executive Order 1) |
| Building permit issued | August 18, 2026 |
| Status | At the foundation stage (Builtie's estimate) |
| Stated construction value | $1M to $5M |
| Builder named on the permits | Bevyhouse LLC |
| Permits at this address since the fire | 2 |
The facts above are read from the City of Los Angeles building permits filed for 333 Las Casas Ave since the January 2025 Palisades Fire. Owners and permit numbers are left out.
Permit timeline
| Issued | Permit | Status |
|---|---|---|
| August 18, 2026 | Grading | Issued |
| August 18, 2026 | New single-family home | Issued |
2 permits since August 18, 2026. A typical rebuild runs demolition and debris clearance, grading and retaining walls, the new building, then the pool and site work.
Where it stands
333 Las Casas Ave is at the foundation stage (Builtie's estimate).
At that stage these trades are inside their award window, the stretch of the build when the builder decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
Other rebuilds on Las Casas Ave
- 332 Las Casas Ave: New single-family home, foundation
- 336 Las Casas Ave: New single-family home, framing
- 354 Las Casas Ave: New single-family home, foundation
- 361 Las Casas Ave: New single-family home, framing
- 362 Las Casas Ave: New single-family home, permitted
- 365 Las Casas Ave: New single-family home, interior trades
- 369 Las Casas Ave: New single-family home, permitted
- 377 Las Casas Ave: New building: revision to an earlier permit, likely complete
All of them: fire rebuilds on Las Casas Ave. Every street: the Pacific Palisades fire rebuild tracker.
For contractors
Builtie tracks every Palisades rebuild permit as it is issued, estimates where each build stands, and names the builder behind it, so a trade can reach them while its part of the job is still open. The decision makers and their verified contacts are in Builtie.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 333 Las Casas Ave, Pacific Palisades?
New single-family home (2 storeys, attached garage, fire sprinklers throughout), permitted August 18, 2026 after the January 2025 Palisades Fire.
What is the status of the rebuild at 333 Las Casas Ave?
It is at the foundation stage (Builtie's estimate), read October 20, 2026.
Is 333 Las Casas Ave a like-for-like rebuild?
Yes. The City marked its permit eligible for the expedited like-for-like track.
Who is building 333 Las Casas Ave?
Bevyhouse LLC is named on the permits. The decision makers and contacts are in Builtie.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
