3400 East Marginal Way S, Seattle: Industrial Building Renovation

Commercial building under construction with a tower crane
Figures read October 20, 2026 from Builtie's permit data.

Industrial Building Renovation at 3400 East Marginal Way S, Seattle was permitted on July 27, 2026 with a stated construction value of $1M to $5M. Site improvements at existing parking lot (Port of Seattle South Facility ) for EV chargers per plan. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address3400 East Marginal Way S, Seattle
ProjectIndustrial Building Renovation
Building typeCommercial
WorkRenovation or alteration
Permit issuedJuly 27, 2026
Stated construction value$1M to $5M
Estimated stageFoundation
Company named on the permitResolved in Builtie
Decision makers and contactsIn Builtie

From the permit: “Site improvements at existing parking lot (Port of Seattle South Facility ) for EV chargers per plan”

Which trades are being bought now

The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:

TradeAward window
Construction Site SecurityBefore the start to 15%
Concrete and FoundationBefore the start to 5%
Structural Steel0% to 15%
Elevators0% to 20%
Framing0% to 20%
Painting5% to 35%
Masonry10% to 30%
Waterproofing10% to 35%
Roofing15% to 35%
Windows, Doors and Glazing15% to 35%

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Seattle

All of them: construction projects in Seattle by address. Seattle's feed rarely names the builder: 1.4% of new-build permits carry one. Builtie resolves the company behind a Seattle project from other records, and does not publish a Seattle builder count because it would describe the feed rather than the market.

Plans

Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 3400 East Marginal Way S?

Industrial Building Renovation. Site improvements at existing parking lot (Port of Seattle South Facility ) for EV chargers per plan

When was the permit issued for 3400 East Marginal Way S?

July 27, 2026, by the City of Seattle.

Who is building 3400 East Marginal Way S?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 3400 East Marginal Way S need now?

At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.

What does Builtie cost?

Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.