366 Palmerston Blvd, Toronto: Single-Family House Renovation
Follow this project · we email you when its status or build stage changes

Single-Family House Renovation at 366 Palmerston Blvd, Toronto was permitted on July 23, 2025 with a stated construction value of $1M to $5M. Renovation or addition to a single-family house. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 366 Palmerston Blvd, Toronto |
| Neighbourhood | Palmerston-Little Italy |
| Project | Single-Family House Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | July 23, 2025 |
| Stated construction value | $1M to $5M |
| Estimated stage | Sub-trades |
| Company named on the permit | The Porretta Group See the decision makers — free trial |
| Decision makers and contacts | See who to contact — free trial |
Follow this project
We email you when it moves to a new status or build stage, plus the new $1M+ projects in Toronto once a week. Free, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- July 23, 2025Small Residential Projects: Single-Family House Renovation · $1M to $5M (this page)
- June 18, 2026New building · under $1M
- June 18, 2026Mechanical
- June 18, 2026Plumbing
- August 2025Estimated construction start (estimate)
- August 2026Estimated completion (estimate; it may already be finished)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 13 months for a job this size). It is not the builder's schedule.
Other big projects nearby: 5 more renovations within 1 km
- 399 Bathurst StAddition or alteration: excavation and shoring · $10M to $25M · November 2025
- 33 Ursula Franklin StAddition or alteration: interior alteration · $5M to $10M · May 2026
- 33 Willcocks StAddition or alteration: interior alteration · $1M to $5M · February 2026
- 333 College StAddition or alteration: excavation and shoring · $1M to $5M · May 2026
- 108 Harbord StAddition · $1M to $5M · April 2026
15 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Aug 2025 – Aug 2026 | Estimate |
| Fire Protection | Oct 2025 – Dec 2025 | Window passed (est.) |
| Signage and Wayfinding | Jan 2026 – Apr 2026 | Window passed (est.) |
| Insulation | Nov 2025 – Jan 2026 | Window passed (est.) |
| Drywall | Nov 2025 – Feb 2026 | Window passed (est.) |
| Low Voltage and Data | Nov 2025 – Feb 2026 | Window passed (est.) |
| Tile | Dec 2025 – Feb 2026 | Window passed (est.) |
| Cabinetry and Millwork | Nov 2025 – Feb 2026 | Window passed (est.) |
| Flooring | Dec 2025 – Feb 2026 | Window passed (est.) |
| Countertops | Dec 2025 – Feb 2026 | Window passed (est.) |
| Finish Carpentry | Dec 2025 – Feb 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (August 2025) to the estimated completion (August 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
Find work like this in Toronto
Leads for your trade: every trade in Toronto.
More projects: every Toronto project of $1M+ by address · major projects in Toronto.
Compare tools: The Best Construction Lead Generation Software in Ontario.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 588 Manning Ave: Single-Family House Renovation
- 586 Manning Ave: Single-Family House Renovation
- 709 Crawford St: Accessory Dwelling Unit Renovation
- 570 Shaw St: School Renovation
- 456 Roxton Rd: Retail Building Renovation
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 366 Palmerston Blvd?
Single-Family House Renovation. Renovation or addition to a single-family house.
When was the permit issued for 366 Palmerston Blvd?
July 23, 2025, by the City of Toronto.
Who is building 366 Palmerston Blvd?
The Porretta Group is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 366 Palmerston Blvd need now?
Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.