456 Roxton Rd, Toronto: Retail Building Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Retail Building Renovation at 456 Roxton Rd, Toronto was permitted on May 30, 2025 with a stated construction value of under $1M. Proposal to construct multiple projects (three storey addition and convert building to a 3 unit dwelling). Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address456 Roxton Rd, Toronto
NeighbourhoodPalmerston-Little Italy
ProjectRetail Building Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedMay 30, 2025
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal to construct multiple projects (three storey addition and convert building to a 3 unit dwelling)”

Where this project is

  1. Since May 20252 other permits at this address
  2. May 30, 2025Small Residential Projects: Retail Building Renovation · under $1M (this page)
  3. May 30, 2025Small Residential Projects
  4. May 30, 2025Mechanical: conversion to residential
  5. May 30, 2025Drains and site services: conversion to residential
  6. May 30, 2025Mechanical
  7. May 30, 2025Plumbing
  8. June 2025Estimated construction start (estimate)
  9. December 2025Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby

  • 157 Delaware AveNew building · $5M to $10M · June 2026
  • 980 Dufferin StAddition or alteration: interior alteration · $1M to $5M · August 2026
  • 900 Dufferin StAddition or alteration: interior alteration · $1M to $5M · April 2026
  • 999 Dufferin StNew construction · $1M to $5M · July 2026
  • 360 Montrose AveNew construction: demolition · $1M to $5M · August 2026

15 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Jun 2025 – Dec 2025Estimate
Fire ProtectionJul 2025 – Sep 2025Window passed (est.)
Signage and WayfindingSep 2025 – Oct 2025Window passed (est.)
InsulationAug 2025 – Sep 2025Window passed (est.)
DrywallAug 2025 – Sep 2025Window passed (est.)
Low Voltage and DataAug 2025 – Sep 2025Window passed (est.)
TileAug 2025 – Sep 2025Window passed (est.)
Cabinetry and MillworkAug 2025 – Sep 2025Window passed (est.)
FlooringAug 2025 – Sep 2025Window passed (est.)
CountertopsAug 2025 – Sep 2025Window passed (est.)
Finish CarpentryAug 2025 – Sep 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (June 2025) to the estimated completion (December 2025) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 456 Roxton Rd?

Retail Building Renovation. Proposal to construct multiple projects (three storey addition and convert building to a 3 unit dwelling)

When was the permit issued for 456 Roxton Rd?

May 30, 2025, by the City of Toronto.

Who is building 456 Roxton Rd?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 456 Roxton Rd need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.