40 Rosehill Ave, Toronto: Condominium Renovation

Condominium Renovation at 40 Rosehill Ave, Toronto was permitted on March 3, 2026 with a stated construction value of under $1M. The condominium's pool mechanical systems are being replaced, and the pool's interior finishes are being restored. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 40 Rosehill Ave, Toronto |
| Neighbourhood | Rosedale-Moore Park |
| Project | Condominium Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | March 3, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Framing |
| Company named on the permit | Aplus General Contractors |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “The condominium's pool mechanical systems are being replaced, and the pool's interior finishes are being restored”
Get new $1M+ projects in Toronto every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- Since June 20103 other permits at this address
- June 7, 2010Plumbing · under $1M
- January 10, 2018Addition or alteration: structural work · $1M to $5M
- May 10, 2021Addition or alteration: interior alteration · under $1M
- August 31, 2022Plumbing
- March 3, 2026Addition or alteration: Condominium Renovation · under $1M (this page)
- July 17, 2026Plumbing · under $1M
- April 2026Estimated construction start (estimate)
- October 2026Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby, including 3 more renovations within 1 km
- 155 Balmoral AveNew building · $50M to $100M · June 2026
- 29 Pleasant BlvdAddition or alteration: excavation and shoring · $10M to $25M · September 2026
- 5 Scrivener SqAddition or alteration · $1M to $5M · August 2026
- 1262 Yonge StAddition or alteration · $1M to $5M · May 2026
- 44 Jackes AveAddition or alteration · $1M to $5M · May 2026
13 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Apr 2026 – Oct 2026 | Estimate |
| Construction Site Security | Mar 2026 – Apr 2026 | Window passed (est.) |
| Painting | Apr 2026 – Jun 2026 | Window passed (est.) |
| Masonry | Apr 2026 | Window passed (est.) |
| Waterproofing | Apr 2026 | Window passed (est.) |
| Roofing | Apr 2026 – May 2026 | Window passed (est.) |
| Windows, Doors and Glazing | Apr 2026 – May 2026 | Window passed (est.) |
| Electrical | Apr 2026 – Jun 2026 | Window passed (est.) |
| HVAC and Mechanical | Apr 2026 – Jun 2026 | Window passed (est.) |
| Plumbing | Apr 2026 – Jun 2026 | Window passed (est.) |
| Fire Protection | Apr 2026 – Jun 2026 | Window passed (est.) |
How we estimate: each bar is the share of the build, from the estimated start (April 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Toronto
- 50 Rosehill Ave: Apartment Building Renovation
- 21 Dale Ave: Apartment Building Renovation
- 1639 Yonge St: School Renovation
- 21 Park Rd: Affordable Housing Renovation
- 160 Bloor St E: Office and Tenant Fit-Out
All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 40 Rosehill Ave?
Condominium Renovation. The condominium's pool mechanical systems are being replaced, and the pool's interior finishes are being restored
When was the permit issued for 40 Rosehill Ave?
March 3, 2026, by the City of Toronto.
Who is building 40 Rosehill Ave?
Aplus General Contractors is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 40 Rosehill Ave need now?
Estimated from the permit date, the award windows for site security; painting; masonry; waterproofing; roofing; window, door and glazing; electrical; HVAC; plumbing; fire protection had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.
What does Builtie cost?
Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.