21 Park Rd, Toronto: Affordable Housing Renovation

Commercial building under construction with a tower crane
Figures read October 24, 2026 from Builtie's permit data.

Affordable Housing Renovation at 21 Park Rd, Toronto was permitted on July 21, 2025 with a stated construction value of under $1M. Proposal for HVAC upgrades to existing municipal shelter, including structural reinforcement and patching of existing roof and interior finishes. Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address21 Park Rd, Toronto
NeighbourhoodRosedale-Moore Park
ProjectAffordable Housing Renovation
Building typeInstitutional
WorkRenovation or alteration
Permit issuedJuly 21, 2025
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Proposal for HVAC upgrades to existing municipal shelter, including structural reinforcement and patching of existing roof and interior finishes”

Where this project is

  1. July 21, 2025Addition or alteration: Affordable Housing Renovation · under $1M (this page)
  2. July 21, 2025Mechanical: structural work
  3. August 2025Estimated construction start (estimate)
  4. February 2026Estimated completion (estimate; it may already be finished)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 3 more renovations within 1 km

  • 717 Church StNew building · $100M to $250M · March 2026
  • 900 Bay StAddition or alteration: interior alteration · $25M to $50M · April 2026
  • 61 Yorkville AveAddition or alteration: interior alteration · $5M to $10M · November 2025
  • 120 Bloor St EAddition or alteration: interior alteration · $1M to $5M · December 2025
  • 90 Queen's ParkDemolition · $1M to $5M · November 2025

25 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Aug 2025 – Feb 2026Estimate
Fire ProtectionSep 2025 – Oct 2025Window passed (est.)
Signage and WayfindingNov 2025 – Dec 2025Window passed (est.)
InsulationSep 2025 – Nov 2025Window passed (est.)
DrywallOct 2025 – Nov 2025Window passed (est.)
Low Voltage and DataOct 2025 – Nov 2025Window passed (est.)
TileOct 2025 – Nov 2025Window passed (est.)
Cabinetry and MillworkOct 2025 – Nov 2025Window passed (est.)
FlooringOct 2025 – Nov 2025Window passed (est.)
CountertopsOct 2025 – Nov 2025Window passed (est.)
Finish CarpentryOct 2025 – Nov 2025Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (August 2025) to the estimated completion (February 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 21 Park Rd?

Affordable Housing Renovation. Proposal for HVAC upgrades to existing municipal shelter, including structural reinforcement and patching of existing roof and interior finishes

When was the permit issued for 21 Park Rd?

July 21, 2025, by the City of Toronto.

Who is building 21 Park Rd?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 21 Park Rd need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.