360 Bloor St E, Toronto: Utility Facility Renovation

Residential development under construction with tower cranes on the skyline
Figures read October 24, 2026 from Builtie's permit data.

Utility Facility Renovation at 360 Bloor St E, Toronto was permitted on March 16, 2026 with a stated construction value of under $1M. Localized mastic and associated concrete repairs within the garage interior, garage roof deck waterproofing replacement at the breezeway, alleyway elastomeric waterproofing, painting to reinstate the finishes within the garage, installing vehicular barrier at… Builtie tracks the project's stage, the trades still being bought and the people who decide.

Find, qualify, identify, reach Findpermits, planning records,builder posts, site checks Qualifyscored 0 to 100 for yourprofile, stage and territory Identifythe company and the personwho awards the work ReachLinkedIn and email, underyour name, done for you

The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.

The project

Address360 Bloor St E, Toronto
NeighbourhoodRosedale-Moore Park
ProjectUtility Facility Renovation
Building typeResidential
WorkRenovation or alteration
Permit issuedMarch 16, 2026
Stated construction valueunder $1M
Estimated stageSub-trades
Company named on the permitReveal the builder — free trial
Decision makers and contactsSee who to contact — free trial

From the permit: “Localized mastic and associated concrete repairs within the garage interior, garage roof deck waterproofing replacement at the breezeway, alleyway elastomeric waterproofing, painting to reinstate the finishes within the garage, installing vehicular barrier at…”

Where this project is

  1. Since August 20075 other permits at this address
  2. August 8, 2007Addition or alteration · under $1M
  3. May 10, 2013Plumbing · under $1M
  4. May 11, 2018Fire and life safety: fire protection · under $1M
  5. December 1, 2021Mechanical: electrical
  6. March 16, 2026Addition or alteration: Utility Facility Renovation · under $1M (this page)
  7. June 15, 2026Addition or alteration · under $1M
  8. March 2026Estimated construction start (estimate)
  9. October 2026Estimated completion (estimate)

How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.

Other big projects nearby, including 4 more renovations within 1 km

  • 717 Church StNew building · $100M to $250M · March 2026
  • 61 Yorkville AveAddition or alteration: interior alteration · $5M to $10M · November 2025
  • 120 Bloor St EAddition or alteration: interior alteration · $1M to $5M · December 2025
  • 550 Ontario StAddition or alteration: roofing · $1M to $5M · January 2026
  • 44 Charles St WAddition or alteration: interior alteration · $1M to $5M · April 2026

17 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →

This project   Nearby projects 1–5, numbered as in the list. Map data © OpenStreetMap contributors, tiles OpenFreeMap.

The company behind this project has another project in Builtie, with 4 permits

  • Toronto · Addition or alteration: interior alteration · $1M to $5M · 2026

Reveal the builder — free trial

Which trades are being bought now

When each trade on this project is usually picked, in calendar months (estimate). As of October 2026 every window below has passed (est.): the project may already be finished.

TradeWhen to approach (est.)Status
Construction (est.)Mar 2026 – Oct 2026Estimate
Fire ProtectionApr 2026 – Jun 2026Window passed (est.)
Signage and WayfindingJun 2026 – Aug 2026Window passed (est.)
InsulationMay 2026 – Jun 2026Window passed (est.)
DrywallMay 2026 – Jun 2026Window passed (est.)
Low Voltage and DataMay 2026 – Jun 2026Window passed (est.)
TileMay 2026 – Jul 2026Window passed (est.)
Cabinetry and MillworkMay 2026 – Jun 2026Window passed (est.)
FlooringMay 2026 – Jul 2026Window passed (est.)
CountertopsMay 2026 – Jul 2026Window passed (est.)
Finish CarpentryMay 2026 – Jul 2026Window passed (est.)

How we estimate: each bar is the share of the build, from the estimated start (March 2026) to the estimated completion (October 2026) above, when the builder usually picks that trade. It is not the builder's schedule.

Get alerted when your trade's window opens — free trial

What Builtie adds

In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.

Other major projects in Toronto

All of them: construction projects in Toronto by address. Builtie's Toronto data is the amalgamated City of Toronto, including Etobicoke, North York, Scarborough, East York and York. Mississauga, Brampton, Vaughan, Oakville and Burlington issue their own permits; Builtie has read them separately since October 2026, so a Toronto count is not a GTA count. Toronto states a construction cost on about a third of 2026 permits.

Plans

Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.

Frequently asked questions

What is being built at 360 Bloor St E?

Utility Facility Renovation. Localized mastic and associated concrete repairs within the garage interior, garage roof deck waterproofing replacement at the breezeway, alleyway elastomeric waterproofing, painting to reinstate the finishes within the garage, installing vehicular barrier at…

When was the permit issued for 360 Bloor St E?

March 16, 2026, by the City of Toronto.

Who is building 360 Bloor St E?

Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.

Which trades does 360 Bloor St E need now?

Estimated from the permit date, the award windows for fire protection, signage, insulation, drywall, low-voltage, tile, cabinetry, flooring, countertop and finish carpentry had passed by October 2026; the project may already be finished. Builtie tracks the builder's next projects.

What does Builtie cost?

Starter is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.