424 8 Av SE, Calgary: Apartment Building

Apartment Building at 424 8 Av SE, Calgary was permitted on March 11, 2026 with a stated construction value of $5M to $10M. 81-unit Apartment building (Library Square - North Building). Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 424 8 Av SE, Calgary |
| Project | Apartment Building |
| Building type | Residential |
| Work | New building |
| Permit issued | March 11, 2026 |
| Stated construction value | $5M to $10M |
| Estimated stage | Foundation |
| Company named on the permit | Axiom Builders |
| Decision makers and contacts | In Builtie |
From the permit: “81-unit Apartment building (Library Square - North Building)”
Which trades are being bought now
The project is at the foundation stage. At that stage these trades are inside their award window, the stretch of the build when the builder or general contractor decides who gets the work:
| Trade | Award window |
|---|---|
| Construction Site Security | Before the start to 15% |
| Concrete and Foundation | Before the start to 5% |
| Structural Steel | 0% to 15% |
| Elevators | 0% to 20% |
| Framing | 0% to 20% |
| Painting | 5% to 35% |
| Masonry | 10% to 30% |
| Waterproofing | 10% to 35% |
| Roofing | 15% to 35% |
| Windows, Doors and Glazing | 15% to 35% |
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in Calgary
- 427 8 Av SE: Apartment Building
- 3310 Hospital Dr NW: School Renovation
- 130 16 Av NW: Apartment Building
- 640 12 Av SW: Office-to-Residential Conversion
- 731 Campus Pl NW: School Renovation
All of them: construction projects in Calgary by address. Calgary's permits name the homebuilder more often than any other city Builtie covers, which makes it the shortest path from a permit to the company that awards the trades.
Plans
Builtie's Starter plan is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from CAD $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 424 8 Av SE?
Apartment Building. 81-unit Apartment building (Library Square - North Building)
When was the permit issued for 424 8 Av SE?
March 11, 2026, by the City of Calgary.
Who is building 424 8 Av SE?
Axiom Builders is named on the permit. The decision makers and their contacts are in Builtie.
Which trades does 424 8 Av SE need now?
At its current stage: site security, concrete, structural steel, elevator, framing, painting, masonry, waterproofing.
What does Builtie cost?
Starter is $79 per seat per month (CAD) for 20 projects; Growth is $99 for 50 projects and adds LinkedIn and email outreach. There is a 7-day free trial with 10 projects.
