430 West 116 Street, Manhattan, New York City: Apartment Building Renovation

Apartment Building Renovation at 430 West 116 Street, Manhattan, New York City was permitted on August 20, 2026 with a stated construction value of under $1M. Interior renovation to apt unit 1er,4e,7c. non structural demolition. installation of new partitions ceiling, lighting and finishes. no change to use, egress or occupancy. no work to facade. replacement of outdated windows no change in opening size. Builtie tracks the project's stage, the trades still being bought and the people who decide.
The same four steps, whether the buyer is a builder, a designer, an owner or a company you want to acquire.
The project
| Address | 430 West 116 Street, Manhattan, New York City |
| Project | Apartment Building Renovation |
| Building type | Residential |
| Work | Renovation or alteration |
| Permit issued | August 20, 2026 |
| Stated construction value | under $1M |
| Estimated stage | Foundation |
| Company named on the permit | Reveal the builder — free trial |
| Decision makers and contacts | See who to contact — free trial |
From the permit: “Interior renovation to apt unit 1er,4e,7c. non structural demolition. installation of new partitions ceiling, lighting and finishes. no change to use, egress or occupancy. no work to facade. replacement of outdated windows no change in opening size”
Get new $1M+ projects in New York City every week
Plus updates on this project. Free, one email a week, unsubscribe anytime.
We email you once to confirm. Privacy
Where this project is
- August 20, 2026Alteration: Apartment Building Renovation · under $1M (this page)
- August 20, 2026Alteration: plumbing · under $1M
- September 14, 2026Alteration: mechanical · under $1M
- September 2026Estimated construction start (estimate)
- March 2027Estimated completion (estimate)
How we estimate: from the permit date and its stated value, with the build lengths Builtie's project feed uses (about 7 months for a job this size). It is not the builder's schedule.
Other big projects nearby
- 46 Claremont Avenue, ManhattanAlteration CO: interior alteration · $100M to $250M · March 2026
- 1120 Amsterdam Avenue, ManhattanAlteration CO: mechanical · $10M to $25M · March 2026
- 220 West 121 Street, ManhattanAlteration: roofing · $5M to $10M · April 2026
- 530 West 120 Street, ManhattanAlteration: demolition · $5M to $10M · March 2026
- 3041 Broadway, ManhattanAlteration: mechanical · $1M to $5M · March 2026
30 projects of $1M+ were permitted within 1 km in the last 12 months. See them all in Builtie →
The company behind this project has 4 other projects in Builtie
- ████████ ConstructionNew York City · Alteration: demolition · under $1M · 2026
- ████████ ConstructionNew York City · Alteration: plumbing · under $1M · 2026
- ████████ ConstructionNew York · General Construction · 2026
Which trades are being bought now
When each trade on this project is usually picked, in calendar months (estimate). As of October 2026: 9 to approach now, 1 passed.
| Trade | When to approach (est.) | Status |
|---|---|---|
| Construction (est.) | Sep 2026 – Mar 2027 | Estimate |
| Construction Site Security | Sep 2026 – Oct 2026 | Approach now |
| Concrete and Foundation | Sep 2026 | Window passed (est.) |
| Structural Steel | Sep 2026 – Oct 2026 | Approach now |
| Elevators | Sep 2026 – Oct 2026 | Approach now |
| Framing | Sep 2026 – Oct 2026 | Approach now |
| Painting | Sep 2026 – Nov 2026 | Approach now |
| Masonry | Sep 2026 – Oct 2026 | Approach now |
| Waterproofing | Sep 2026 – Oct 2026 | Approach now |
| Roofing | Oct 2026 – Nov 2026 | Approach now |
| Windows, Doors and Glazing | Sep 2026 – Nov 2026 | Approach now |
How we estimate: each bar is the share of the build, from the estimated start (September 2026) to the estimated completion (March 2027) above, when the builder usually picks that trade. It is not the builder's schedule.
What Builtie adds
In Builtie: the decision makers on this project and their verified contacts, the trades already credited on it, the builder's other active permits, and LinkedIn and email outreach that runs while you work.
Other major projects in New York City
- 1998 Atlantic Avenue, Brooklyn: Transit Facility Renovation
- 157 West 82 Street, Manhattan: Apartment Building Renovation
- 132 6 Avenue, Brooklyn: Apartment Building Renovation
- 308 Greene Avenue, Brooklyn: 4-Storey Apartment Building Renovation
- 2152 Muliner Avenue, Bronx: 2-Storey Apartment Building Renovation
All of them: construction projects in New York City by address. All five boroughs are in the feed, which has run since February 27, 2026. New York issues separate permits for each trade, so the firm named on a permit is often the trade contractor, an engineer or an expediter rather than the developer. Builtie groups the permits into projects and resolves the owner and builder separately.
Plans
Builtie's Starter plan is $79 per seat per month for 20 projects; Growth is $99 for 50 projects and adds the LinkedIn and email outreach you run yourself. Opening a project spends one credit, and the decision makers, emails, phones and AI call script inside it are included. Your monthly credits reset at each renewal, and extra credit packs are valid for 30 days. The free trial runs 7 days with 10 projects. Custom, where Builtie's team runs the outreach for you, starts from $1,500 a month on top of a Growth seat.
Frequently asked questions
What is being built at 430 West 116 Street, Manhattan?
Apartment Building Renovation. Interior renovation to apt unit 1er,4e,7c. non structural demolition. installation of new partitions ceiling, lighting and finishes. no change to use, egress or occupancy. no work to facade. replacement of outdated windows no change in opening size
When was the permit issued for 430 West 116 Street, Manhattan?
August 20, 2026, by New York City.
Who is building 430 West 116 Street, Manhattan?
Builtie resolves the builder or general contractor behind the permit and attaches a verified decision maker.
Which trades does 430 West 116 Street, Manhattan need now?
Estimated as of October 2026, the trades to approach now are site security; structural steel; elevator; framing; painting; masonry; waterproofing; roofing; window, door and glazing. Already passed: concrete.